Loading...
Villages C P3&4-CS 950408FILE No. 683 04/08 '95 ll:Oi~/.D:TIPTON ENGINEERING 2~4 2.2& ~946 PAGE reed engineering, O EOTECI-h'N ICA& CONj:~ u LTLA N Ts' August 12, 1991 Project No. 755 Grand/Lakes of Coppe11 III c/o Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. ?gG Letter Fill Observation and Testing Lakes of Coppe11, Phase III Coppell, Texas Gentlem~n: our firm was retaina~ by Grand/Lakes o£ Coppell III to/observe and repor~ dated ~Tuiy~ ~. ~u ~- -- ~h these .... ~---~ --~ compacted by the con~ractor in accordance w~ If any questions arS.e, do not hesitate tO call. 2424 ~I'UT'Z DRIVE · SUITE 400 · DALLAS, TEXAS 75235 · 214/350.5600 a (FAX! 2141350-0Oltj FILE No. 683 04/08 '95 ll:02~.i.D:TIPTON ENGINEERING 214 ?~ 1946 PAGE reed engineering GEOTIECHNICAL CONSULTAN ~ · 6 September 30, 1992 Project No. 755.1 Rspo~c No. 13 Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN= Mr. Pat Atkins, P.E. Construction Materials Testing Residential Building Pads Villages of Coppell, Phase IIIB Coppell, Texas Gentlemen= Submitted here are the results of testing and observation of construction materials at the referenoed project. This riport addresses the fill placemln~ in the re~idential building pads from September 14 through 30, 1992. During the above period, 20 field density tests were taken on the fill placed ~n the residential building pads in Blocks A and B of Phase IIIB. Test results are shown on Plate 1. Where tested, the fill was found ~o comply with the project specifications. Addit~onal reports will be submitted as the work progresses. Sincerely, RPR/wde copies submitted: ~1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole (1) City of Coppell/Engineering Department/ Mr. Larry Davis 24245TUTZDFIIVE · SUITE400 · DALLAS, TEXAS75235 · ?'4/350-5600 · (FAXi214/3BO-0019 FILE No. 683 04/08 '95 11:02 ID:TIPTON ENGINEERING 214 2..~ 1946 PAGE 7 reed engineering v~LLAGB~ OF COPPBL~ PItASS ~IIB COPPBLL~ TEXA~ REI~)RT NO. 13 09-15--92 09-16-92 09-17-92 09-18-92 09-28-92 09-29-92 09-30-92 Field Density Tests on Residential Buildinu Pads Test Block No~ No. Depth Below Unit Final Dry LOt S.G. weight 359 A 39 2.0 360 A 37 2.0 361 A 36 0.0 362 A 38 2.0 363 A 41 1.5 364 A 41 1.0 365 A 34 0.0 366 A 32 0.0 367 A -30 0.0 368 A --25 0.0 369 A "~26 0.0 370 A --24 0.0 371 A 22 0.0 372 A 20 0,0 373 A 39 0.0 374 B 10 0.0 375 A 41 0.O 376 A 37 0.0 377 B 12 0.0 378 B 14 0.0 Moisture Con~ent Curve NO. 111 9 15.7 109 2 17.0 112 2 12.8 110 2 12.5 113 0 11.8 109 1 13.2 112 4 12.9 112 4 14.1 113 4 12.9 113 1 13,5 111 9 14.6 108 7 15.9 110 0 15.1 109 2 15.8 109 9 15.5 109,4 15.0 110.2 13.4 110 · 3 14 · 1 113.2 14.0 110.0 14.4 pac- tion Level 11 97.3 11 95.0 11 97.5 11 95.8 11 98.3 11 95.0 11 97.7 11 97.7 11 98.6 11 98.3 11 97,3 11 95.1' 11 95.6 11 95.0 11 95.6 11 95.1 11 95.8 11 95.9 11 98.~ 11 95, Plate 1 G~IO~ ECI'I~CAL CONSULTANTS FILE Ilo. 683 04/08 '95 11:00 ID:TIPTON ENGINEERING 214 2j~.6 1946 PRGE reed engine ring (~EOTECHNIG~L CO NSIJ L'FAN'T~ Nove~ber 11, 1992 No. 755.1 Lakes of Coppell, PHase III General Partnership c/o Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN= Mr. Pat Atkins, P.E. 79G Latter Field Density Testing Lakes of Coppell, Phase IIIB Coppell, Texas Gentlemen: Our fl~m was retained by Lakes of Coppell, Phase III General Partnership to perfo=m field density tests on the fill placed at the referenced sits. This work was accomplished using the earthwor~ specifications attached to our geotechnical report dated July, 1991. To the best of OUr knowledge, the fill wes placed and compacted by the contractor in accordance with =he sps¢ifica~ions. All site filling has now been completed. If any questions arise, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. RFR/wde copies submitted: (1) 24.24 STU'rZ DRIVE · SUITE400 · DALLAS, TEXAs75235 . 214/350-5600 · (FAX) 214/350-0019