Vista Point II-CS050705T H E: · C I T Y . 0 F
COPPELL
MEMORANDUM
TO:
FROM:
DATE:
REF:
Ken Griffin, Director of Engineering/Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector ~/~
July 5, 2005
WALK-THRU for Vista Point II, Lots 1 & 2 (Office/Warehouse)
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for
Thursday, July 7th at 9:00 a.m.
Please let me know if I can be of further assistance.
CC:
James Hall, CalHar Construction, Inc.
Jeff Baty, Master Concrete
Roger Pavlovich, Cadence McShane
Christopher Gardner, Jackson-Shaw Company
BROADCAST CONFIRMATION REPORT
PAGES = 01
TOTAL TIME = 00:01~8"
LOCATION ID
KEYPAD
9?28382299
2144410574
972 239 1214
234
PAGES
01
01
01
01
0?/05/2005 08:3?
IDcCITY OF COPPELL ENGR. DEPT.
RESULT LOCATION ID
PAGES RESULT
OK
OK
OK
OK