Loading...
Vista Point II-CS050705T H E: · C I T Y . 0 F COPPELL MEMORANDUM TO: FROM: DATE: REF: Ken Griffin, Director of Engineering/Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Larry Davis, Construction Inspector ~/~ July 5, 2005 WALK-THRU for Vista Point II, Lots 1 & 2 (Office/Warehouse) A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for Thursday, July 7th at 9:00 a.m. Please let me know if I can be of further assistance. CC: James Hall, CalHar Construction, Inc. Jeff Baty, Master Concrete Roger Pavlovich, Cadence McShane Christopher Gardner, Jackson-Shaw Company BROADCAST CONFIRMATION REPORT PAGES = 01 TOTAL TIME = 00:01~8" LOCATION ID KEYPAD 9?28382299 2144410574 972 239 1214 234 PAGES 01 01 01 01 0?/05/2005 08:3? IDcCITY OF COPPELL ENGR. DEPT. RESULT LOCATION ID PAGES RESULT OK OK OK OK