Vista Point II 3-7-CS050705 T H E; G I T Y 0 F
CO?P-ELL
PRE-CONSTRUCTION ATTENDANCE SHEET
PROJECT:
VISTA POIN~ II, Lots 3-7 Infrastructure
DATE: July 5, 2005 TIME: 2:00 p.m.
NAME REPRESENTING PHONE FAX
11.
12.
13.
14.
15.
PRECONSTRUCTION CONFERENCE
VISTA POINT 2
TUESDAY, JULY 5, 2005 - 2:00 P.M.
CITY OF COPPELL
Total Cost of Public Imprs.
3 1/2% Inspection Fee
__ Escrow + $250 Adm. Fee
Street Signage
Traffic Control
__ TxDOT Permit
__ Sidewalk __ Density
Erosion Control Punch List
__ TCEQ As-Built
Sewer-$2/LF + $250 Adm. Fee Bond
12 Sets/Bluelines for File Copy __ Final Cost
__ Overtime $45/Hr. Min. 4 Hrs. PW
PALS
NAME
Jerry Roberts
Eric Schrack
COMPANy
City of Lewisville
City of Lewisville
TELEPHONE
972-219-3495
972-219-3496