Loading...
MA0405-LR050625 one Engineenng Client: City of CoppelI Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235932 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 06/25/2005 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: 1 SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days SLUMI' (in): 4" maximum AIR (%): NA TEST METHOD: ASTM C- 172 ASTM C-31 ~,,~1: ASTM C-I43 ASTM C-231 ASTM C-1064 ASYM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 732 SLUM~ PLACEMENT DATE: 06/15/2005 (inches) WEATHER CONDITIONS: Clear 4.5 TIME SAMI'LED: 9: I 0am BATCH TIME: NA TEMPERATURE (F) - AIR 87 F CONCRETE: 88 F tRUCK NO: 217 TICKET NO: 148653 Am CONTENT (%): NA UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MaeAnhur and Smnuel; northwest and southwest corners of MacArthur and North Village; and northwest comer of MaeArthur and Parkway SAMPLE LOCATION: REPORT OF TESTS Northwest and southwest comer of MacArthur and Samuel, 2nd lit Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE AGE SET NO. TESTED (days) 1 1 06/20/2005 5 1 2 06/22/2005 7 MAXIMUM DIAMETER AREA LOAD (inches) (sq.in.) (lbs. force) 6.00 28.26 101730 6.00 28.26 105970 1 3 07/13/2005 28 0.00 1 4 07/13/2005 28 0.00 Water added at site: 10 gallons Technician: Francisco Calvillo, CET Report Distribution: (1) City of Coppell (i) City of Coppell Started: 8:30am 0.00 0.00 Finished: 10:30am COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3600 Unbonded Cap 3750 UnbondedCap Unbonded Cap Unbonded Cap Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. O/SS Page 1 ofl Rone Engineering Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235853 Project No.: 0510346 Date of Service: 06/14/2005 Report Date: 06/25/2005 Services: Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Pavement Services PLANT: NA SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 3" - 5" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: NA PLACEM-ENT DATE: 06/14/2005 WEATHER CONDITIONS: Sutlny TIME SAMPLED: 12:40pm BATCHTUgIE: 12:36pm TEMPERATURE (F) - AIR 94 F CONCRETE: 97 V TRUCKNO: 2022 TICKET NO: 1826 AIR CONTENT (%): 1.8 UNITWEIGHT(pci): NA OVERALL PLACEMENT LOCATION: Paving replacement at north and south turn lane of Parlovay Road and MacArthur intersection MEASURED SLUME (inches) 4.75 SAMPLE LOCATION: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLI~rDER MAXIMTM MARKED DATE AGE DIAMETER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) COMPRESSIVE STRENGTH (psi) FRACTURE I~ypE 1 ! 06/21/2005 7 6.00 28.26 1 2 07/12/2005 28 0.00 0.00 1 3 07/12/2005 28 0.00 0.00 1 4 Hold Technician: Osvaldo Flores Report Distribution: (I) City of Coppell (I) City of Coppell Started: 10:45am 81270 2870 Unbonded Cap UnbondedCap UnbondextCap Finished: l:15pm C~~~ ng Project Manager LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of 1 lone Engineering 8908 Ambassador Row, Dallas~ TX 75247 2696 Graval Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Report No.: 235940 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 06/25/2005 Project: Brick Paver Replacement MA 04-05 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Pavement Services PLANT: Mobile Crete SPECIFICATION REQUmEMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 2 SLUMP PLACEMENT DATE: 06/15/2005 (inches) WEATHER CONDITIONS: Clear 4.0 TIME SAMPLED: 9;50anl BATCHTIME: 7:40am TEMPERATURE (F) - AIR 89 F CONCRETE: 90 F TRUCK NO: 2621 TIC~T NO: 1827 AIR CONTENT (%): NA UNITWEIGHT(pcf}: NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MacAathur and Samuel; norlhwest and southwest comers of MacArthur and North Village; northwest comer of MacArthur and Parkway SAMFLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Northwest and southwest comer of MacArthur and Samuel, first lift CYLIINDER MAXIMUNI MARKED DATE AGE DIAMETER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) 1 1 06/20/2005 5 6.00 28.26 115820 7 6.00 28.26 121170 28 0.00 0.00 28 0.00 0.00 1 2 06/22/2005 07/13/2005 07/13/2005 See Report g235932 for technician time. Technician: Francisco Calvillo, CET Report Distribution: (1) City of Coppall (1) City of Coppell Started: Finished: COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 4100 Unbonded Cap 4290 Unbonded Cap Unbonded Cap Unbonded Cap Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of simila~ subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 0ISS Page 1 of 1