Ballet TX-LR050630SAM ENGINEERING & TESTING, L.P. Serving The Goo-Industry Since 1974 '~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 DRILLED PIER INSPECTION REPORT REPORT DATE: 7/1/05 TEST DATE: 6/30/05 CLIENT: Head Construction, Inc. TEST METHOD: Visual 3030 LB J, Suite 700 Dallas, TX 75234~ CASING (YES/NO): YES* a~'-II~,~emy of Texas CASING DEPTH (FT): * PROJECT: Proposed B WATER I DRY (FT): * 145 Fitne~,~ou rt Coppel~Cl'X PLUMB (YES I NO): YES ATTN: Ken Head SE&T TECHNICIAN: Dusty McClendon & Mike Saint PROJECT NO.: 286TXlK5 REPORT NO. 20 PAGE 1 OF 3 1 ** 30" 24" 23 18** Hard to very hard gray SHALE 3 24" 18" 24 19 17 36" 30" 24 19 21 30" 24" 23 18 / Notes: * (1). The above pier numbers are per the attached sketch. (2). Water.seepages were encountered in all piers. Therefore, steel casin~ls with a 24" diameter/ 15'-16' deep, a 30" diameter/19'-20' deep and a 36" diameter/20' deep were used. (3).** Durin9 the withdrawl of the steel casin~l, the rebar cage was pulled 10' above ~lmund (i.e. the lower 10' of this pier does not have rebam). The engineer (Steve Foose) has been notified & will address this at a later date. I (4). All above piers except #1 were satisfactory and in-accordance with the on-site foundation plan by Steve Foose and dated 5118/05. I I Reinforcing steel placed per plans & specifications unless otherwise noted. It has been a pleasure to serve you on this project & we trust that this Very Truly Yours, SAM Engineering & Testing, Inc. Sadik (SAM)AI-Musawe, M.Sc., Ph. D, P.E. Civil & Environmental Engineer Texas Registration Number: 61893 SAM ENGINEERING & TESTING, L.P. 1~ Serving The Goo-Industry Since 1974 .~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CLIENT: PROJECT: Head Construction, Inc, 3030 LB J, Suite 700 Dallas, TX 75234 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT STANDARD 6" X 12" AREA 28.27 SQ. IN. Proposed Ballet Academy of Texas 145 Fitness Court Coppell, TX Concrete Supplier: Ticket #: ATTN: Ken Head SE&T TECHNICIAN: Dusty McClendon LOCATION OF PLACEMENT: Piers # 1,3,17 & 21 Time Arrived: 9:30 AM REPORT DATE: 7/1/05 SAMPLE DATE: 6/30/05 PROJECT NO.: 286TXlK5 REPORT NO.: 20 PAGE 2 OF 3 Southern Star Time Left: 1:30 PM 833999 Slump (Inches/: 6 Truck #: 1880 Time Batched: 9:45 AM Concrete Temperature (F): % Air Content: 93 N/A Time Sampled: 10:45 AM Total No. of Test Cylinders Made: 4 Product Code: 9329 Total Cubic Yards Placed: 20 Cement: N/A Added Water: N/A Hot & Sunny Weather Conditions: FI), Ash: N/A Coarse A~lgregate: N/A Water: N/A Air Temperature (F): 95 it~C~ N/A % Air Content: N/A lA 7 7/7/05 3000~28 1 B 14 7/14/05 3000/28 1C 28 7/28/05 3000/28 1 D 28 7/28/05 3000/28 Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Remarks: Very Truly Yours, Sadik (~.; P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only applies to the samples tested and does not necessarily represent identical or similar samples. G:/2005/286txik5/C istr/C i r ~ ~, .0D'4,2'0,...0".: .~4-.94 CONC, WALK 'eel