DRILLED PIER INSPECTION REPORT
REPORT DATE: 7/1/05 TEST DATE: 6/30/05
CLIENT: Head Construction, Inc. TEST METHOD: Visual
3030 LB J, Suite 700
Dallas, TX 75234~ CASING (YES/NO): YES*
a~'-II~,~emy of Texas CASING DEPTH (FT): *
PROJECT: Proposed B WATER I DRY (FT): *
145 Fitne~,~ou rt
Coppel~Cl'X PLUMB (YES I NO): YES
ATTN: Ken Head SE&T TECHNICIAN: Dusty McClendon &
Mike Saint
PROJECT NO.: 286TXlK5 REPORT NO. 20 PAGE 1 OF 3
1 ** 30" 24" 23 18** Hard to very hard gray SHALE
3 24" 18" 24 19
17 36" 30" 24 19
21 30" 24" 23 18
/
Notes: * (1). The above pier numbers are per the attached sketch.
(2). Water.seepages were encountered in all piers. Therefore, steel casin~ls with a 24" diameter/
15'-16' deep, a 30" diameter/19'-20' deep and a 36" diameter/20' deep were used.
(3).** Durin9 the withdrawl of the steel casin~l, the rebar cage was pulled 10' above ~lmund
(i.e. the lower 10' of this pier does not have rebam). The engineer (Steve Foose) has been
notified & will address this at a later date. I
(4). All above piers except #1 were satisfactory and in-accordance with the on-site foundation plan
by Steve Foose and dated 5118/05. I I
Reinforcing steel placed per plans & specifications unless otherwise noted.
It has been a pleasure to serve you on this project & we trust that this
Very Truly Yours,
SAM Engineering & Testing, Inc.
Sadik (SAM)AI-Musawe, M.Sc., Ph. D, P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
SAM ENGINEERING & TESTING, L.P.
1~ Serving The Goo-Industry Since 1974 .~
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CLIENT:
PROJECT:
Head Construction, Inc,
3030 LB J, Suite 700
Dallas, TX 75234
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
STANDARD 6" X 12"
AREA 28.27 SQ. IN.
Proposed Ballet Academy of Texas
145 Fitness Court
Coppell, TX
Concrete Supplier:
Ticket #:
ATTN: Ken Head
SE&T TECHNICIAN: Dusty McClendon
LOCATION OF PLACEMENT: Piers # 1,3,17 & 21
Time Arrived: 9:30 AM
REPORT DATE: 7/1/05
SAMPLE DATE: 6/30/05
PROJECT NO.: 286TXlK5
REPORT NO.: 20
PAGE 2 OF 3
Southern Star
Time Left: 1:30 PM 833999
Slump (Inches/: 6 Truck #: 1880
Time Batched: 9:45 AM
Concrete Temperature (F):
% Air Content:
93
N/A
Time Sampled:
10:45 AM
Total No. of Test Cylinders Made: 4 Product Code: 9329
Total Cubic Yards Placed: 20 Cement: N/A
Added Water: N/A
Hot & Sunny
Weather Conditions:
FI), Ash: N/A
Coarse A~lgregate: N/A
Water: N/A
Air Temperature (F): 95
it~C~ N/A % Air Content: N/A
lA 7 7/7/05 3000~28
1 B 14 7/14/05 3000/28
1C 28 7/28/05 3000/28
1 D 28 7/28/05 3000/28
Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
Very Truly Yours,
Sadik (~.; P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent.
This report only applies to the samples tested and does not necessarily represent identical or similar samples.