Loading...
ST9302-CS 980804 (2)SENT BY~CITY OF DALLAS ~: `8- 5-98 :10~10AM 1 t~ CfTY OF DALLAS August a, 1998 Mr. Lee Allison, P.E. Kimley Horn and Associates 8U 1 Cherry Street, Suite 11 UU Fort Worth , TX 76102-bHa3 RE: Sandy T,.akc Road from Denton Tap to MacArthur Rear Mr. Allison: WATER UTILITIES-' r.,~ 214 304 3570 # 2/ 8 ST t 3 ~ a- Attached for your use are our cammcnts to the revised specifications for this project. After making the necessary changes, please furnish our office with a complete set of plans and specifications for a final review. Jun Batted will be on vacation for the next four weeks tc~ help care for his wife and newborn girl. Should you need any additional infori~~ation or have any questions, feel free to call me at (214)948-4388. ~ r. s ... Z~ Project Manager ~f/~~j (~ Development Services / Q C: K. Griffin, ). Milstead, File Water Utilities pepartment Development Serviced • 320 E. Jetfersvn, Room 218 a Dallas, Texas 75203 •214 / 948-4590 A city utility providing regional water and wastewater sRrvices vital to public health and safety. '~ SENT BY~CITY OF DALLAS 8- 5-98 ;10~10AM ; WATER UT1L ~TIES-~ 214 304 3570;# 3/ 8 ~' ,. Sandy i.rthe Road from Derrton Drive to MacArthur Boalevard Comments Relating to the Revised Specificatioax (Reed 8/3/1998) Refer to Comments Dated July Z4, 1998 Review of As-Advertise Plans and Specifications: 1. The air relief valve was added at station 86+44.59 instead of 86+00 as requested. "Phis is not at the high point. This may require a minor plan revision but should not affect the bids. 2. Done. :3, Sheet 15 was never provided. This may require a miner plan revision but should not affect the bide. 4. Unable to verify because plans between stations 29+25 to 33+50 were not provided. 'Phis may significantly at'fect the bide if not done. S. Unable to verify because plans were nat provided. 6. 7'he contract numbers were posted on the plans hrrt not on the specifications. 7. Done. 8. Done. 9. llone. 10. Done. 11. Done. 12. This was not done, but may be provided later. 13. Item no. G14Awas added but item no. 2058A was not deleted. The amount needs to be increased from one to three. 14. Done. Delete the following bid items: 1. These items need to be deleted t'rorn the Bid l~a•ms and Bid Itctn Descriptions. 2. These items were deleted from the Bid item Descriptions and needs to be deleted from the Bid Forms. 3, item SbOCP was deleted from the Bid Forms and needs to be deleted from the Bid Item Descriptions. 4. Items 700 and 701 were deleted from the Bid Forms and needs to be deleted from the Bid Item Descriptions. S. Done. 6. Item 515H was deleted 1'roir, the Hid Forms and needs to be deleted from the Bid Item Descriptions. 7. ltem S77B ways deleted from the Bid 'F'ornns and needs to be deleted from the Bid Item Descriptions. 8. Item 5770 was deleted from the Bid Farms and needs to be deleted from the Bid Item Descriptions. ~}. ltem 2067 was deleted from the Bid Fonns and needs to be deleted from the Bid Item Descriptions. SENT BY~CITY OF DALLAS~`8- 5-98 ;10~11AM : WATER UTIL~I~TIES-+ 214 304 3570:# 4/ 8 1 Pagc 2 Comments Continued Add the following required/contingency bid items and c~~rresponding quantities: 1. Done. 2. Done. 3. Dane 4. Uone. S. Done 6. Done. 7. Tone. New Additional Comments: I . Therc may be a typo in Section 4, page 6 of G, pay item #132. The last a~entence seems incorrev~t. 982 t 6C131, Sandylake SENT BY~CITY OF DALLAS `8- 5-98 ;10~11AM WATER UTILITIES-~ 214 304 3570;# 5/ 8 it City of Dallas July 24, 1998 Mr. Lec Allison, P.E. Kimley I"Iom and Associates, Tnc. Suite 1100 80I Cheery Street Fort Worth, Texas ?6102-6803 Re: Sandy Lake Road from Denton Tap to MacArthur Blvd DWU Contract No. 98-311F Joint Contract with the City of Coppell Dcaz Mr. Allison: Transmitted thru Fax and Mail Fax. No. 817-3355070 z-'µ~i ~Hat~ ~Baha, P.F;. Section Manager As discussed with you in our pre-bid meeting; of June 21, 1998 on the above captioned project, please ineotrorate the attached list of 30 items in the addendum to be submitted to the bidders on July 31, 1998. We do not utilize mobilization as a separate bid item. We concur with your recommendation to provide for additional verbiage in the specifications to inform the bidders that tnobililation cost is spread out among the other items. Temporary paving and traffic control, i.e., barricading are included in Item Nv. 200SP "Dar-wrapped cylinder concrete water pipe with paving". T~ucdiermore, traffc control is included in the general specification in reference to the DWLT addendum to NCT stan'dazd specifications for Public Works Construction; Item 1.?4.2 of General Provisions, copy attached. Please furnish us a copy of the addendrun and provide tts with five (5} sets of completed plans and specifcatioms for distribution. Subsequent to the bid opening, provide us with a copy of the bid tabulations Should you have any questions feel free to call zx~e at (214) 948-4591. ,Project lJngineer Development Services e: K. Griffin, J. Milstc}ad, H.i3aha, M.Fay, bile Weterr Utilities Dspartment Devetppment Services ~ 320 E Jefferson, Room 218 • Pallas, Texas 75203. 214 / 948-4590 A city utility providing regional water and wastewater services vita! to publ~ heaEth and safety. SENT BY~CITY OF DALLAS ; 8- 5-98 ;10~12AM ; WATER UTILITIES-+ 214 304 3570;# 6/ 8 -- Sandy Lake iZ.oad from Denton Tap to MacArthur Blvd 685W-67$A sheet I through Xb Review of As-Advertised Plans and Specifications: 1. At Station 86+00 there is a high point in the 30" water line with a 24" air bubble: an air relief valve is required at this location (see sheet 11). 2. The linear feet of pipe to be installed is missing from sheet 4. 3. The station equation on sheet 15 is correct in the profile, but is reversed in the plan view. 4. "Lowering #3" from station 29+25 to 33+SO is still missing. 5. The requested vertical 6-inch blow-of tap-valve on the existing 30" waver pipe at paving station 38 +50 for de-watering the existing main prior to tie-in with the new pipe is not shown on the as-advertised plans. 6. DWU Contract No. 98-311F must be added to the plans and specitcations. 7. In Item 1 of Section A 1 rFf the DWU portion of the specifications, reference must be made to "see Map 685W-678A plan-profile sheets 1 through 16." 8. In Special Provision S-1, overtime charges for inspection is $30 per hour, not $25, with a minimum of S60 per day, rather than $50 per day. 9. In Special Provision S-3, delete "DWC.1 Drawings, Details and Standard Appurtenances" and substitute "DWU Standard Drawings". 10. In Special Provision 5-10, delete "valve" and substitute "water manhole". 11. In Item No. 2005p, delete "Pretensioned" and substitute "Bar-WrApped", since pretensioned is no longer availabe and has been replaced with bar-wrapped. Add the phrase "and all embedment materials" to the end of the second paragraph, after "sod, seed, elc.)". t2. Provide a list of all 'intended Investigation locations (50 are called out in the specs). List by paving station and offset in the General Notes on the plans. 13. Utilize DWU Bid Item Nv. 614A and associated bid item description as found in the DWU Bid item Manual for Abatidan F,xisting Manhole (in lieu of 20S8A and the inadequate description currently shown in the specifications}. Increase the count from one to three. 14. In Part IV (p.1-36) of the specifications, the Materials Unit Price and Construction Unit Price columns are not needed. llelete the following bid items: 1. Delete $id Items No. 506A (4" water service) and 150LP (4" DI pipe) since there is no such service shown on the plans. The 30" line is a transmission main to Flower Mound and has no intermediate service taps withun the City of Coppell. 2. Bid Items No. 203 and 204: connections are not paid by DWU as a separate bid item. 3. Bid Item No. 560CP: there is i~o "cut and plug existing main" shown on the plans. 4. Bid Items No. 700 and 701: all embedment materials are included in the pipe bid item (see comment #12 above). 5. Bid Item No. 10(! Mobilization: Larry Scalf, City of Dallas Assistant City Attorney, has determined that this is an illegal bid item, per Randy Nelson, PE. "Ihe Only Reran Yw And I Are Flue !s To Servo Tho Cilium Of Dallw" SENT I3Y~CITY OF DALLAS 8- 5-98 ;10~13AM ~ l~9ATER llT1L1T1ES-~ 214 304 3~7Q~# 7! 8 b. Bid Item No. 515H is redundant, since Item 515P is already described as being "complete", including all materials and labor. 7. Bid Item No. 57713 is redundant, since Item 576B is already described as being "complete", including all materials and tabor. 8. Bid Item No. 5770 is redundant, since Item 57bC is already describes as being "complete" , including all materials and labor. 9. Bid Item No. 2067 Abandon Existing Water Service: there are no existing water services off this transmission main within the CoppelI Ciry Limits. Add the following requiredlcontingency bid items and corresponding quantities: 1. Add Bid Item 707B Throst Blocking, which will be required for all tie-in bends. 2. Add Bid Item 7USA Sand Backfill as a contingency. 3. Add Bid Item 704C Modified FIowabte Backfill as a contingency. 4. Add Bid Item 703 Rock Foundation as a contingency. 5. Add Bid Item 2033 for adjustment of water valve covers to finished paving grade. 6. Add Bid Item 2034 for adjustment of water manhole lids to finished paving grade. 7. Acid Bid Item 2042 for adjustment of Type II Air Valves tv finished paving grade. Reviewed by: Michael Fay .tun Battad 98205MF1.Sandylaks "11+e Only Rttawn You And [Are He~c [~ To sccvc The Citizens gFFMq.1s' SENT BY~C,ITY OF DALLAS 8- 5-98 ;10~14AM ~ WATER UTILITIES-' 214 304 3570~~ $l $ . firm or co~,~oration." ~~ . „..Add. "1,~3,1 '"The COIVTItAC'TOR is responsible for obtaining an EPA Storm Water Permit that maybe required for construction of this project under regulations contained in 40 CFR Part 122, as amended, under the authority of the Clean Water Act, 33 U.S.C. 125I et seq. These regulations require the filing of a . notice of intent to obtain and abide by the general storm water permit for construction activities, including cleaning, grading, and excavation, that disturb the applicable amount of total land area, Contact, EPA Region VI, 1445 Ross Ave., Suite 1200, Dallas, Texas 75202-2733, (214) b55-7175, for permitting information and requirements. If a permit is required, the CONTRACTOR shall provide measures to control soil erosion sediment and water pollution created by construction operations for the duration of the Contract as directed by the Engineer. These measures snail be in addition to those required of the C:ON'I'RACTOR under Subsections 3.12.4 {a) through {e) of the Standard Specifications, as amended." .24,2. Add after the last paragraph: "All easement provisions for construction in, under or upon private pr~perry are to be adhered to and are made a part of the Contract by reference. The CONTR.ACI"OR must comply with all provisions of the City of Dall~~s Traffic Barricades Manual, including all revisions. A copy of this manual may be obtained from the Engineer. The CONTRAGI'OR is respc~nsiblr; for the support of al] structures affected by his excavation, trenching, or other construction activities. In addition, the GONTI~ACTOR will be held responsible for al] dam>~ a to the wor4c and other public and private property due to the failure of warning devices, barricades, signs, lights or other precautionary measures in protecting the work or property and whenever evidence is found :>f such damage, the Engineer may order the damaged portion immediately removed and replaced by and at the cost and expense of the CONTRACTOR." 1.24.3 ~ Add at the end of the paragraph: 'The CONTRACTOR is advised that Federal Regulations 29 C.F.R. 1926.&50 -1426.652 have been, in their most recent version as amended, in effect since January 2, 1840. The CONTRACTOR shall install a trench safety system in accord~7nce with Occupational Safety and Health Administration Standards I9?ti.b52 Page 5 s.:,