WA0101-LR050705Construction Materials Testing
and Environmental Consulting
Texas
CMT,
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
thod: ASTM D2922 D3017 D698 Pa~e I of 2
Required Density (%): 95% -100%
Required Moisture (%): 0 to +5% omc
5 Water line - 2' below grade
100.7 17.6 98.9
67 Station 65+00
2 Water line - 1' below grade
68 ;ration 65+00 108.3 16.5 97.0
3 Water line - Final
69 ;tation 65+00 106.7 14.8 95.1
5 Water line - 3' below grade
70 Station 67+00 96.6 16.5 95.0
5 Water line - 2' below grade
71 Station 67+00 97.4 17.4 95.7
5 Water line - I' below grade
72 Station 67+00 100.7 16.9 98.9
5 Water line - Final
73 Station 67+00 100.9 19.1 99.1
5 Water line - 3' below grade
74 Station 70+00 99.8 19.6 98.0
Test results meet project specifications
TEXAS CMT, INC.
DALLAS, TEXAS
(214) 352-6957
REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
Densit~ ~ort No. 7 (205-0137) Method: ASTM D2922 D3017 D698 Pa~e 2 of 2
Client: City of Coppell Material Description Maximum Optimum
Dry Moisture
Density Content
Project: Hwy. 121 Water Line (Lbs/CuFt) Percent
1. Orange and Light Brown Silty Sand 117.9 10.5
Test Date: Julle 30~ 2005 2. Brown Silty Clay with Gravel I 11.6 I S.3
3. Brown Sand}' Clay with Gravel 112.2 13.1
Report Date: July 5, 2005 4. Brown Sandy Clay II 1.0 14.5
5. Brown and Yellowish Brown Clay 101.8 15.0
Required Density (%): 95% -100%
Required Moisture (%): 0 to +5% omc
Mat Location/Elevation (and'or) Lil~ In-Place In-Place Percent
No Dry Density Moisture Compaction
Test ( Lbs/CuF) Content (%)
No
Probe
Depth
5 Water line - 2' below grade
75 Station 70+00 97.0 16.1 95.3
5 Water line - 1' below grade
76 Station 70+00 97.6 17.5 95.9
5 Water line - Final
77 Station 70+00 100.4 18.0 98.6
5 Water line - 3' below grade
78 Station 73+00 98.0 19.4 96.3
5 Water line - 2' below grade
79 Station 73+00 98.6 16.2 96.9
5 Water line - 1' below grade
80 Station 73 +00 I 01.0 16.7 99.2
5 Water line - Final
81 Station 73+00 100.7 18,9 98.9
Test results meet project specifications
cc Ms Suzan C Taylor- Cit~ nfCoppell M Lam,' Da; s - Ci y of Coppell
Mr Luis V¢lasquez - Fox Contractors, lnc
Mr Douglas K Showers - Birkhoff, } Iendricks & Conway, LLP
Construction Materials Testing
and Environmental Consulting
Texas
CM%
IBC
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
D3017D698 P: elof2
Densit}, Report No. 8 (205-0137) Memoa:
Client: City of Coppell Material DescnpUon Maxtmum Opumum
DO' Moisture
Density Content
Prc~ject: Hwy. 121 Water Line (Lbs,,CuFt) Percent
1. Orange and Light Brown Silt)' Sand 117.9 10.5
111.6 IS.3
Test Date: July I, 2005 2 Brown Silty (?la) with Gravel 112.2 13.1
3. Brown Sandy Clay with Gravel lll.O 14.5
Report Date: July 5, 2005 4. Brown Sandy Clay
5. Brown and Yellovtish Brown Cia3, 101.8 15.0
Required Density (%): 95% -100%
Required Moisture (%): 0 to +5% omc
In-Place In-Place Percent
4 Water line - 2' below grade 106.3 14.6 95.8
82 Station 62+00
5 Water line - I' below grade
83 Station 62+00 I 01.7 17.3 99.9
3 Water line - Final 110.2 13.4 98.2
84 Station 62+00
Test results meet project specifications
cc Ms SuzanC Taylor-Cd¥ofCoppell Mr Lar~ Davis - Cdy of Coppell
Mr Luis Velasquez - [:ox Contractors, lnc
Mr Douglas K Showers - Birkhofi} tlendricks & Conway, LLP
Construction Materials Testing
and Environmental Consulting
Texas
CMT,
Inc..
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
Density Report No. 4 (205-0147) Method: ASTM D2922 D3017 D698 1 ofl
Client: Fox Contractors Material Descnpnon Maximum Optimum
Dry. Moisture
Density Content
Project: Hwy. 121 Water Line (Lbs/CuFt) Percent
Test Date: June 30, 2005 I. Orange and Light Brown Silty Sand 117.9 10.5
2. Brown Silty Clay with Gravel 111.6 15.3
3. Brown Sandy Clay with Gravel 112.2 13.1
Report Date: July 5, 2005 4. Brown Sandy Clay 111.0 14.5
5. Brown & Yellowish Brown Clay 101.8 15.0
Required Density (%): 95% -100%
Required Moisture (%): 0 to +5% omc
Mat Location/EIe~ation (and Jo0 Lift In-Place In-Place Percent
No
Test DD Density Moisture Compaction
No (Lbs/CuF) Content (%)
5 Retest of # 65
15 93,4 24,4 * 91.7 *
5 Retest of # 66
16 99.7 19.8 97.9
* Test results do not meet project specifications
cc: Ms Suzan C Taylor - Citwlf CoppelI Mr LarryDavis CityofCoppell
Mr Luis Velasquez - Fox Contractors
Mr Douglas K Showers - Birkhoff Hendricks & Conway LLP
Construction Materials Testing
and Environmental Consulting
T xas
CMT,
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
Densit' Report No. 5 (20%0147) Method: ASTM D2922 D3017 D698 Pa~e I of I
Client: Fox Contractors Material Description Maximum Optimum
Project: Hwy. 121 Water Line (LbmCuFt) Percent
1. Orange and Light Brown Silty Sand 117.9 10.5
Test Date: July 1, 2005 2. Brown Silty Clay with Gravel 111.6 15.3
3. Brown Sandy Clay with Gravel 112.2 13.1
Report Date: July 5, 2005 4. Brown Sandy Clay 111.0 14.5
5. Brown & Yellowish Brown Clay 101.8 15.0
Required Density (%): 95% -100%
Required Moisture (%): 0 to +5% omc
Mat Location;Elevation (and/or) Lift In-Place In-Place Percent
No Dry. Dcnsity Moisture Compaction
Test /Lbs/CuF) Content (%)
No
Probe
Depth
3 Retest of # 65
17 106.6 14.5 95.0
Test results meet project specifications
cc Ms Suzan C Taylor- City of Coppell
Mr Lar~ Davis - City of Coppell
Mr Luis Velasquez - Fox Contractors, Inc
Mr Douglas K Showers ~ Birkhofl} ttcndricks & Conway, LL?