Loading...
Ballet TX-lr050617S^M E.GI.EE. .G & TES I.G, ,.,. Serving The Goo-Industry Since 1974 '~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 IN-PLACE DENSITY OF SOIL CLIENT: Head Construction, Inc. REPORT DATE: 6/17/05 TEST DATE: 6/16/05 3030 LB J, Suite 700 Dallas, TX 75234 ~ TEST METHOD:ASTMD-2292 & 3017 PROJECT: Proposed B~Je~demy of Texas *ASTM D698A - See Proctor Report for Details 145 ~ Court ~,~5'ell,TX Minimum Required Compaction = 95% PROJECT#: 286TXlK$ REPORT#: 12 PAGE 1 OF 1 ATTN: Ken Head SE&T TECHNICIAN: Danny Payne Southeast Corner of Pad 3rd 1 115 11 4 117 13 10-16 ~ 98 I] P East Center of Pad 3rd 1 113 3 4 117 13 10-16 ~ 97~ P All ~ens~t~es meet tbs minimum require~ values unlsss othe~se n~ ~ ~s been a pleasure to se~e you on t~is pro~ect and we trust that th~s Very Truly Yours, SAM Engineering & Testing, L.P. Sadik (SAM) Al-Musawe, M.Sc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893