Loading...
MA FY 0405-LR050518Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of C0ppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving in alley @ 332 Westwood Court 02.1077 18 May 2005 SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM C231) Unit Weight IASTM C138) Ambient Temp. SET 1 SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) MIX NO. Cement Flyash Sand in. 1,0 in, Water Admix //1 Admix //2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C 143) psi Strength 446 7 O5/25/05 447 28 06/15/05 448 28 06/15/05 90,600 3200 117,70Q 4160 112,700. 3990 28-Day Average 4080 4000 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: 1 hour lab. processing (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148