Loading...
Coppell Trade-LR050609 (2)REPORT OF REINFORCING STEEL OBSERVATION 'lrerracon 8901 Carpenter F~vy., Suite #100 Dallas, Texas 75247 Date of Service: 06/09/05 Report No.: Client No.: 93345 Project No.: Client: Coppell Trade Center LP Project: 5055 Keller Springs Rd Ste 300 Addison, TX 75001 94051190.0028 94051190 Coppell Trade Center - Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Approved 06/06/05, C-01 Locations/Items Observed: Parking S of Building C Test Method: Visual Observation REPORT OF OBSERVATION Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: MI. Laxon Technician: B. Thomas Report Distribution: (1) Coppell Trade Center LP (1) TechnlStructuras (1) City of Coppell TX (1) City of Coppell TX 309acs l rr can (1) McFadden & Miller (1) Macatee Engineering inc