DR0001-CS050707T H E C I T Y O F
COPPELL
July 7, 2005
Jean S. Boney
Site Concrete, Inc
PO Box 154489
Irving TX 75015-4489
RE: Notification of Repairs / Maintenance Bond
MacArthur Blvd. / Samuel Blvd. Drainage Improvement Project # DR 00-01
Dear Ms. Boney:
An inspection of the referenced project has been conducted by representatives of the City of
Coppell prior to the expiration of the two-year Maintenance Bond.
The following items need to be resolved prior to September 2, 2005:
1. The street cuts are coming apart. They need to be re-cut and patched in several places.
Please contact me at 972-304-7090 to inform me of the date when your crews will be on the project
to correct the deficiencies.
Sincerely,
Construction Inspector
CC:
Ken Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Civil Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works
Tim Oates, Fire Marshal