Loading...
ST9302-CS 980803 (2)AUG 83 '98 05:59PM KIM~ ~HORM FT WORTH and Assodates, Inc, Far. Transmittal Suit~ tl~O Fo~ Worth, 'tX 76102-6803 'FEI.. 817 335 6511 FA~ 817 335 5070 Firm/Location: Job No.' Date:,. I~/~'/'~' , Original coming by mail: Yes: No:K- If you have any problems, please call 817/335-6511 and ask for: Total number of pages, including cover sheet:, Engineen~g Planting and Enwronrnental Consultants This facsimile is intended only for the addressee named herein and may contain informal'on that is confidential If you are not the intended recipient or Ihe employee or agent responsible for deliveq/ to the addressee, you are hereby notified that any review, dissemination, disclosure, or copying of this communication is striclly prohibited, ti you have received this facsimile in error, please immediately notify us by telephone, and return the original facsimile Io us ai the address above via the U.S, Postal Service. Thank you. AUG OB '98 06:00PM KIMb~-HORM FT WORTH P.2710 Sandy Lake Road Pre-Bid Meeting Notes Meeting Time: 2:00 P.M., Tuesday, July 21, 1998 Meeting Place: Coppell City Hall, 255 Parkway Blvd., 2"a Floor Conference Room I. Before the meeting, J.R. Wilson, Gifford-Hill-American, Ine.'s Senior Sales Representative, stated his concern over PVC and PE water pipe being smaller I.D. than the specified sizes. II. a) b) ¢) e) Meeting Agenda Jim Ragsdill, City of Coppell Purchasing Agent, said that any addendum must be issued at least 4 days prior to the bid opening. Addendum will be issued prior to August 1, 1998. Jun Battad, DWU Engineer, will fax his comments to KHA tomorrow to include with Addendum. Item No. 2 of the pre-bid Agenda should read as "Qualification Requirements", not "Pre- qualification Requirements". 2 or 3 low bidders must submit financial statement, expense record, and equipment schedule within 5 days after the bid opening. Utility shutdowns will be coordinated with DWU, UTRWD, Coppell, and Flower Mound. Item No. 6 - City obtained permission from property owner at Sra. 16+68 (right) to reconstruct stockade fence on top of retaining wall. Item No. 7 - East end of project will tie into paving plans from Sverdrup (not available yet). Final quantities may be affected. This Dallas County project may be revised so that the City of Coppell can construct Sand Lake Road through MaeArthur Blvd. on the east end of the project. Dallas County will be involved with inspection of this part of the project including: g) Paving Drainage Sewer Line Relocation and Traffic Signals However, this may be assigned as a change order or bid as a separate project. Item No. 8, Moore Road / Sandy lake Road intersection will be constructed as part of this project. RUG OB '98 06:00PM KIM~-HORM FT WORTH P.3/10 Sandy Lake Road Pre-Bid Meeting Notes, July 21, 1998, Page 2 III. Comments to Contractor's questions. a) Phased construction for filling borrow ditches is subsidiary to the project (no additional payment for this item will be made). b) Potholing for the existing DWU 30" water main is included as a separate bid item. c) Contractor shall provide a construction trailer for the project, and shall include space for the City's Project Representative. Two possible sites for the trailer are the T.U.R.O.W. and Gordon Hood tract. d) Normal working hours for the City Project Representative are Monday through Friday 8:00 A.M. - 5:00 P.M. Extended working hours are usually approved by the City, provided that the noise ordinances are met. Overtime pay for inspection will be paid by the Contractor at a rate of $30/hour, 4 hours minimum, including weekends and holidays. The City will either hire an inspector (via contract services) or use one of the current inspectors assigned for development and capital improvement projects. e) Prevailing wage rates will be included in the Addendum. f) All water used by the Contractor will be purchased from the City. The Contractor must pay a deposit for the construction meter and pay monthly commercial rates for the water used. (Water used for filling water mains must also be purchased.) g) DWU Bid Form will be revised to show only each Bid Item's total price; the material and labor costs will be removed from the Bid Form. h) Computerized Bid Forms must include bid prices in both words and figures; Contractor shall sign Bid Affidavit and submit 2 copies of the Bid Form (1 original and 1 copy). i) DWU Bid Form will be revised to include both mobilization and move-in/move-out bid items. j) City of Coppell will pay for initial construction testing. The testing lab has not yet been selected. k) Temporary Pavement: 1) Detour Lane widths = 10' minimum 2) Temporary pavement thickness = 6" base + 2" HMAC. Contractor must maintain in a driveable, safe condition. 3) No designated left turn lanes will be required. ' I - P.4×lO AUG 03 '98 06:01PM KIM HORM FT WORTH ~ Sandy Lake Road Pre-Bid Meeting Notes, July 21, 1998, P~ge 3 4) Markings, buttons, signs, painting will be included as part of the traffic control plan submittal to the City. 5) Concrete barriers will be included as a separate Bid item in the Addendum. 1) Coppell award recommendation will go to the City Council for approval on August 25. The work start date will be approximately October 1. m) Franchise Utility Relocations: Companies have been notified to relocate south side transmission poles, (TU) north side distribution lines (TU), and gas lines at Moore Road (Lone Star Gas.) n) DWU award recommendation will go to the City council August 12. The'financial details and agreement have been finalized between the 2 cities. o) There are no minority / women's business requirements on this project. p) There are no areas along Sandy Lake Road for a concrete batch plant. T.U. will probably not allow this on their R.O.W. (Texas Air Control Regulations must be met). q) City's testing does not alleviate Contractor's responsibility for their own quality control. r) The addendum will address the contract award based on all or part of the alternate bid items (lime vs. cement stabilization, drilled shafts eliminated for spread on footing retaining walls) s) Contractor will state time required to complete project. This will also be a selection determination. t) this project will be high-profile: (news coverage, ribbon cutting ceremonies, etc.) u) Debris in proposed concrete channel area will be removed by the Contractor. v) Concrete channel will stop at the location designated as a future landscaping pond. w) Pay requests usually receive a 5-day turnaround period at the City. No interest can be charged for late payments as applicable to State laws. x) Contractor shall submit traffic control plans, and sequence of construction schedules to the City of review. y) Field changes may be necessary due to new development along Sandy Lake Road (streets, driveways, water/sewer lines, drainage, etc.) KIM~-HORH FT WORTH P.5×10 Sandy Lake Road Pre-Bid Meeting Notes, July 21, 1998, Page 4 z) No earthwork cross-sections are currently available, old sections and survey data are available to the Contractors upon request. This information is only application for phasing development by the Contractor. aa) The typical road section per City Standards will be included in the addendum. bb) Temporary fencing will be necessary at the Hertz/S.L.R.S.W. corner (dog kennels) cc) Alt tree removal must be coordinated with the city in advance. All trees approved for removal must be disposed of as soon as possible after cutting. dd) The areas on the plans designated as straight sidewalks are limited by right-of-way width. ee) No fly ash will be allowed in concrete mix designs. fl) Contractor must submit traffic control plan designating week-end road closings and high early strength concrete for intersection construction. M~ P.GxlO AUG 03 '98 OG:O1PM KI -HORH FT WORTH ~ Sandy Lake Road PreBid Couference Agenda, July 21, 1998, Page 4 CITY OF COPPELL SANDY LAKE ROAD PAVING, DRAINAGE, WATER SYSTEM IMPROVEMENTS PRE-BID CONFE~NCE ATTENDANCE SHEET NAME: PHONE No.: COMPANY: 335 16. 17. HA 18, //"' / July 21, 1998 yegr-/- 7a/q I ' I . O~2~1~ 0~ '~ .06:0~PM K~M~.~-HORN FT PP~VA~ WOR'TFERINI~ * 817 ~35 50?0 The City of Coppell is r~e coutracdn& ago'ney for this co.~.trucrion project., Thc following statute requizesany contracti~ agency to specify · ~eneml~y prevadLUg rate of we~es m contracts that are bid. Vemon's T~a~ Civil ~mtes - Arkie $159a: "Constmctiou of Public Works in Sta~ and Municipal or Political Sulxlivisions; Prevailing Wage I~te to be Maintained.' i Pu~c to du: rcquiremeaLs of ttds statut~,~,tt~ City of Coppell, has ascertaiaed ~e followin~ rates of wages ate paid m various classifw, ations of '.,workers in be iqcality of ttzis project. Not less than the following hourly rates shal~ be paid for thc various classifications of work required by general prevailing rate of 'laborer" for me ,~snous classlncauons ot wors The hourly rate for l. gal holiday ami gmes thc base hourly rat~. The--'"' ,,,~.m~,,4 ~l,e ioumeymau rates.; Aopreariccs may be u~ed on the p.roject and .n~.y .~c ~'--r'~----- ~'-'="' -' -'- ..... ~-- ~,,,, not'at a za~ not less thazt 60 ~ of the journeyman s wage as ~hown At no time ~hnll ajo~ supe~e mote man one U) apptmm~. ~ ,,t'¥-"'""'" ' aader ~he direct supervision of a jouraeyma~ wotid~ as a c~ew. CLASSIFICATION Air Tool Operator Asphalt Raker Asphalt Shoveler Batching Plant Weighel Batterboard Setter Carpenter Concrete Finisher- Pa~iing Concrete Finisher -Stru',ctures Concrete Rubber Electrician Flagger Form Builder - Struotur~s HOURLY RATE $ 7.554 8.565 8.255 6.371 8.620 9.447 9.345 9.058 7.733 12.761 5.598 8.717 Jiddin$ Docam~r~$ '1'1 l T Laborer- Common Laborer- Utility Manhole Builder Mechanic Oiler Servicer Painter- Structures Piledriver ' Pipelayer ! Blaster Asphalt Distributor Ol~rator Asp.halt Paving Machine 06:03PM KIMI~-HORH FT WORTii[ERING '~ 819 ~-~5 I I · CLASS?ICATION I HOURLY RATE Form Liner- Paving &;Curb Form Setter - Paving 8t, Curb 8.686 Form Setter - Structures 8.427 6.402 7.461 · 11.000 10.658 8.698 8.104 10.913 7.500 8.509 11.333 .8.404 9.053 Broom or Sweeper Ol:ierator 7.908 Bulldozer, 150 HP & I.~ss 8.703 Bulldozer, Over 150 .HP 9.160 Concrete Paving Cunr~g. Machine 8.213 Concrete Paving Finia,hlng Machine 9.453 Concrete Paving Forn~, Grader 6.500 Concrete Paving JointlMachine 9.042 Concrete Paving Joint'Sealer 7.350 7.875 Concrete Paving Floal~ 9.290 Concrete, Paving Saw ~, Concrete Paving Spreader 9.750 Paving Sub-Grader j 9.000 Slipform Machine Opelrator 9.000 Crane, Clamshell, Bacikhoe Derrick, Dragline, .S~tovel Less Than 1~ C.Y., 9.513 Crane, Clamshell, Bac~khoe Derrick. Dragline, Sh~oval 1~ C.Y. & Over , 10.517 Crusher or Screening ~iant 9.500 Operator Form Loader i 12.000 Foundation Drill Ope~tor Crawler Mounted , 10.000 Foundation Drill Operator Truck Mounted 11.1 38 Front End Loader 2% C.Y. & Less 8.823 I ' t ~/:3{'RU-C.- 03 ' 9-8- 0~: 03PH- 'K-~I~Y-HORH ~:LASSIFICATION , Front End Loader Over 2% C.Y. Hoist- Double Drum Milling Machine Operator Mixer (Over 16 C.F.) ~ Mixer (16 C.F. & Less) Mixer- Concrete Paving Motor Grader Operat~ Fine Grade i Motor Grader Operator Pavement Marking Ma. chine Roller, Steel Wheel Plant-mix Pavements I Roller, Steel WheeI.Ol~er Flatwheel or Tampinlg Roller, Pneumatic, Sel~.propelled Scraper- 17 C.Y. & Lmiss Scraper- Over 17 C.Y,. Side Boom , Tractor - Crawler Type. 150 HP & Less , Tmc'tor- Crawler Typi Over 150 HP Tractor- Pneumatic Traveling Mixer Trenching Machine _L~ht Trenching Machine HQavy Post Hole Driller Oper!ator Wagon-drill, Boring M~chine Reinforcing Steel Setter Paving Reinforcing Steel Setter Structurers ~ Steel Worker Structural Sign Erector ~ Spreader Box OperatOr Barricade Servicer i Zone Work ,I Mounted Sign Installer Permanent Ground; Truck Driver - Single Axle Light I Truck Driver - Single Axle Heavy HOURLY RATE 9,311 8.917 6.650 9.000 7.913 9.500 10.346 9.891 6.402 8.339 7.963 7.403 6,138 8.205 7.793 8.448 8.873 7.735 7.615 8.188 12.498 9.000 9.000 9.218 11.548 12.860 11.436 6.988 6.402 6.402 7.465 8.067 +3.440 06:03PM KIMLF~-HOR~ FT-~ORT~RIN~ ~ 817 ~5 $8~ CLASSIFICATION 1 Truck Driver - Tandem Axle Semi-Trailer ~ Truck Driver - Lowboy/flOat Truc,~ Driver - Transit M x Truck Driver - Winch Vibrator Operator Welder .HOURLY RATE 7.816 9.653 7.507 8.200 7.000 10.459