ST9302-CS 980731 (2) CITY OF COPPELL SANDY LAKE ROAD PAVING, DRAINAGE, AND WATER SYSTEM IMPROVEME]~T~S PROJECT # ST 93-02 BID # Q0598-07 ADDENDUM 1: RELEASE DATE: Friday, July 31, 1998 BIDS TO BE RECEIVED: 2:00 P.M., Thursday, August 6, 1991 The following additions shall be made to the appropriate sections of t and shall become a part of the Contract Documents. Bidders shall ac addendum on the bid proposal and on the outside of the sealed envelc Cr~ ?~0~ PRE-BID CONFERENCE, 2:00 P.M., Tuesday, July 21, 1998 Attached is the sign-in sheet from the Pre-Bid Conference. Response ........... u~,,~,~,~ at the conference are attached. CLARIFICATIONS: 1. Pavement markings shall be priced and installed per Sheet SD2 of the City of Coppell Standard Construction Details. 2. The existing 16 inch diameter water line is RCCP pipe. The terminus of Coppell's 30 inch water line near Station 105+00 is not resolved to date. The quantifies shown in the bid form match the extent of the water main shown on the plans. The extension or connection of this new main in the future will be addressed during construction. 4. Ail reference to "pre-tensioned" concrete cylinder pipe should be revised to read "bar wrapped" concrete cylinder pipe. 5. "Omni Flex" joint material, or an approved equivalent, shall be used for the Coppell portion of the contract, in lieu of "RAM NECK", or similar joint material. SPECIFICATIONS: SECTION 1 - BIDDING DOCUMENTS: Ao Delete the Bid Form (pages 1-14 through 144) in its entirety and insert the attached Bid Form in its place. (Staple the new Bid Form to the Contract Documents.) Bidders shall acknowledge receipt of Addendum #1 in the space provided in the new Bid Form. 1 of 6 CITY OF COPPI~I.L SANDY LAKE ROAD PAVING, DRAINAGE, AND WATER SYSTEM IMPROVEMENTS PROJECT # ST 93-02 BID # Q0598-07 ADDENDUM 1: REI.I~.ASE DATE: Friday, July 31, 1998 BIDS TO BE RECEIVED: 2:00 P.M., Thursday, August 6, 1998 The following additions shall be made to the appropriate sections of the plans and specifications and shall become a part of the Contract Documents. Bidders shall acknowledge receipt of this ~ddendum on the bid proposal and on the outside of the sealed envelope. PRE-BID CONFERENCE, 2:00 P.M., Tuesday, July 21, 1998 Attached is the sign-in sheet from the Pre-Bid Conference. Responses to Contractor's questions at the conference are attached. CLARIFICATIONS: 1. Pavement markings shall be priced and installed per Sheet SD2 of the City of Coppell Standard Construction Details. 2. The existing 16 inch diameter water line is RCCP pipe. The terminus of Coppell's 30 inch water line near Station 105+00 is not resolved to date. The quantifies shown in the bid form match the extent of the water main shown on the plans. The extension or connection of this new main in the future will be addressed during construction. 4. All reference to "pre-tensioned" concrete cylinder pipe should be revised to read "bar wrapped" concrete cylinder pipe. 5. "Omni Flex" joint material, or an approved equivalent, shall be used for the Coppell portion of the contract, in lieu of "RAM NECK", or similar joint material. SPECIFICATIONS: SECTION 1 - BIDDING DOCUMENTS: Delete the Bid Form (pages 1-14 through 144) in its entirety and insert the attached Bid Form in its place. (Staple the new Bid Form to the Contract Documents.) Bidders shall acknowledge receipt of Addendum #1 in the space provided in the new Bid Form. 1 of 6 Coppell Sandy Lake Road Paving, Drainage, and Water System Improvements, Addendum No. 1 B. Insert the following "Prevailing Wage Rate' immediately after the Bid Affidavit: (See attached) C. Insert the following item after Item 29, "Maintenance Bond". "30. Bid Security Each bid must be accompanied by a certified check of the bidder, or a bid bend duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such checks or bid bends will be returned to all except the litree lowest bidders within thirty days after the opening of bids and the remaining cheeks or bid bonds will be returned promptly after the Owner and the aeoep~ bidder have executed lhe contract or, if no award ha~ been made within sixty days after the date of the opening of bids, upon demand of the bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid." SECTION 3 - CITY OF COPPELL SPECIFIC PROJECT REQUIRF3~NTS 1.11 TESTING LABORATORY SERVICE: Add the following at the end of the paragraph: "Testing by the City does not alleviate the Contractor's responsibility for his own quality assurance/quality control testing. Contractor shall replace any deficient construction 1.13 PRESERVATION OF TREES: Add the following at the end of the paragraph: "All trees approved for removal shall be disposed of as soon as possible afar cutting." 1.16 EXISTING UTILITIES, STRUCTURES, AND OTHER PROPERTY: Insert the following phrase in the second line of Item E, after the word "removals": "... utility shut downs, ..." 1.20 INSPECTION: Add the following paragraph: 2 of 6 Copper Sandy Lake Road Paving, Drainage, and Water System Improvements, Addendum No. 1 "Normal working hours for the City's project representative are Monday through Friday, 8:00 AM to 5:00 PM. Overtime pay for inspections will be paid by the Contracter at a rate of $30 per hour, 4 hours minimum, including weekends and holidays." 1.24 TRAFFIC SIGNALS: Add the following sentence at the end of Item 24. "The Contractor shall keep all signals operational throughout the duration of the project." Add the following item to SECTION 3 - SPECIFIC PROJECT REQUIRMENTS: 1.25 TEMPORARY CHAIN LINK FENCE: Contractor shall erect a temporary 6 foot, chain link fence prior to removing the existing fence and wall just west of Heartz. The Contractor shall notify and coordinate with the City and property owner prior to erecting the fence. The fence shall be removed by the Contractor after the new wail and fence are in place." · _~_.CTION 4 - CITY OF COPPELL DESCRIFrION OF PAY ITEMS Pay Item #1 - Mobilization Insert the following after the first sentence: "This pay item shall include mobilization costs for the entire project, including the 30 inch water line for D WU.' Pay Item #8 - Unclassified Street Excavation Replace the last sentence with the following: "Cross sections will be taken in the field by the Owner just prior to the start of construction to document the exis~g elevation of the roadway and all features along the project corridor. Afar the roadways are graded and the concrete pavement is in place, the Owner's surveyor will document the actual top of curb elevations. Payment shall be on the basis of the bid price per cubic yard as calculated by comparing the original cross sections to the "as built" top of curb elevations, netting out the volume of the pavement section. Said payment shall be total compensation for furnishing ail materiais, tools, equipment, labor and any incidentals necessary to complete the work." Pay Items ~ through #36 - Class HI Reinforced Concrete Pipe Delete the words "or high density polyethylene 0tDPE)' from the title and description. HDPE will not be allowed in accordance with the City of Coppell's standard specifications. 3 of 6 CoppeH Sandy Lake Road Paving, Drainage, and Water System Improvements, Addendum No. 1 Pay Item//63 - Structural Sidewalk Add the following after the first sentence: "This quantity includes the portion of sidewalk under the wall.' Pay Item//64 - Integral Concrete Wall Delete the station "10+71" and replace it with "10+65". Pay Item g76 - Temporary Roadway Add the following after the last paragraph: "Minimum width of detours and temporary lanes shall be 10 feet. Temporary Pavement Thickness shall be a minimum of 2" HMAC over 6" Flexible base. The Contractor shall maintain temporary pavement in a driveable, safe condition at all times. No designated left-turn lanes will be required during construction of this roadway All warning devices shall be included in this pay item except concrete barriers. (See SECTION 3 - SPECIFIC PROJECT REQUIRE- MENTS - Item 1.15) This item shall also include any temporary pavement or plating required to patch all utility trenebes to maintain traffic." Pay Item/f77 - Concrete Barriers This item shall consist of concrete barriers along the temporary roadway. Measurement and payment shall be on the basis of the linear foot bid price and shall be compensation for furni~ing all materials, tools, equipment, labor, and any incidentals necessary to complete the work. Pay Item #83 - Temporary Chain Link Fence This item shall consist of furrdshing, installing, and removing a 6 foot high temporary chain link fence along the property just west of Heartz, on the south side of Sandy Lake Road. Measure- ment and payment shah b~ on the basis of the bid price per linear foot and shall be total compensation for furnishing aH martials, tools, equipment, labor and any incidentals necessary to complete the work. Pay Item #84 - 8 Foot Cedar Fence This item shall consist of furni~ing and installing an 8 foot high cedar fence, including galvanized steel posts and hardware, along the top of the proposed retaining wall just west of Heartz on the south side of Sandy Lake Road. Measurement and payment shall be on the basis of the bid price per linear foot and shah be total compensation for furnishing all materials, tools, equipment, labor and any incidentals necessary to complete the work. 4 of 6 Coppell Sandy I_ntke Road Paving, Drainage, and Water System Improvements, Addendum No. I Pay Item//86 through//88 - Water l~lni~l~ (Pretensioned Concrete Cylinder Pipe (PCCP, Class 150), PVC DR-25, Polyethylene DR-9). Replace the descriptions of these pay items with the following paragraphs: "These pay items shall consist of the construction of 30', 24", and 16' water mains consisting of pre-tensioned concrete cylinder pipe (PCCP) Class 150, PVC DR-25, or polyethylene (PE) DR-9. Contractor shall submit shop drawings for all water main pipe to be used on the project for approval by the Engineer. PVC pipe (DR-25) is acceptable for 16', 24", and 30' sizes. 22' PE pipe (DR-9) is only acceptable for 16' water main sizes given the minimum wall thicknesses for the pressure class. Water mains shall meet the following AWWA Standards: PCCP - AWWA C303, PVC - AWWA C905, PE - AWWA C906. All pipe mall be designed to operate at 150 psi. The main line pipe will be measured horizontally from center of titling to center of fitting or end of pipe without any deduction for the length of intermediate fittings, specials or valves. Measurement for payment shall be made on a linear foot basis at the contract unit price and shall include: furnishing, hauling and installing pipe; titlings and specials; full eireumferentially welded joints for restraint on the existing and new PCCP water main; de-watering where necessary; trench excavation; rock excavation; backfilling and compaction, including embedment material as specified per City of Coppell Standard Construction Details; protecting or replacing existing structures or utilities; disposal of surplus materials; cleaning up and maintenance; sign removal and replacement; surveying and replacement of monuments; traffic control; dust control; removal of mud from roadways; and any incidental work and materials, all in strict accordance with the plans and specifications. Payment for main line pipe shall include any and all extra precautions or construction requirements necessary to adequately protect and support existing utilities. Payment for main line pipe shall include all costs required to have utility companies repair any damage inflicted to their lines by the Contractor and any cleanup, property damages, fines, etc. resulting from damage inffieted to any utility line by the Contractor. Restrained joints shall be provided as necessary and shall consist of full welded joints on PCCP water mains in accordance with specifications." Add the following pay item: "Pay Item//132 - DWU Portion of Common Project lay Items This deduct pay item shall consist of the portion of the cost of common pay items attribmable to pay items in "Part IV - Dallas Water Utilities 30' Water Main" of the Bid Form. The Contractor shall quantify the cost of the portion of items including, but not limited to, mobilization, field office, right of way preparation, traffic control plan, removing existing curb and/or pavement, temporary roadway, topsoil, hydromulch, concrete barriers, bonding, etc. These are examples of items which are listed as "subsidiary~ to other pay items in "Section 5 - DWU Information to 5 of 6 CoppeH Sandy Lake Road Paving, Drainage, and Water System Improvements, Addendum No. i Bidders, Special Provisions, and Description of Pay Items". The common pay items in Parts I, II, and mi of the Bid Form are to be priced to reflect the cost for the total project." SECTION 5 - DALLAS WATER UTILITIES INFORMATION TO BIDDERS, SPECIAL PROVISIONS, AND DESCRIFrION OF PAY ITEMS: Delete the Section 5 issued previously and insert the attached Section 5 in its place. Note that revised or new text is underlined. DRAWINGS A. The following drawings are being reissued as part of this Addendum (all sheets numbered with the letter "A"): Sanitary Sewer & 16' Water Main Sheet Numbers 1, 2, 3, 4, 7, 10, 13, and 16 30" Water Main Construction Sheet Numbers 37 and 38 Paving and Drainage Sheet Numbers 44 and 45 Cross Street Plan View Sheet Number 65 Paving and Drainage Details Sheet Number 78 Retaining Walls Sheet Numbers 87, 88, 89, 90, and 91 Irrigation Sleeving Sheet Numbers 108, 109, 110, 111, 112, and 113 30" Water Line- Dallas Water Utilities Sheet Numbers 01, 04, 06 and 11 B. The following drawing is new and issued as a part of this Addendum: 30" Water Line - Dallas Water Utilities Sheet Number 0lA END OF ADDENDUM P:\93021.00\93021SPCLStDD~1 .DOC 6 of 6 BID FORM PROJECT IDENTIFICATION: Sandy Lake Ro~d Paving, Drainage, nod Water System Improvements- Project # ST 93-02, in Coppen, TX. BID OF DATE (NAM~ OF FroM) THIS BID IS SUBMITTED TO: City of Coppell (hereinafter ~dled OWNER) C/O l~lrdla~dn~ Agent 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 CITY OF COPPF&L BID NO: Q0598-07 The undersigned BIDDER proposes and agrees, if thi~ Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and finnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. BIDDER accepts all of the tenns and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders. This Bid will remain subject to acceptan~ for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the Agreement with other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER's Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set fo~da in the Agreement, that: BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged): No: Date: BIDDER has familiarized itself with the na0Jre and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Rggulafions that in any manner may affect cost, progress, performance or furnishing of the Work. 1 - 14 Bidding Documents Revised Addendum No. 1