Loading...
TC Bank-CS050718COFFELL July 18, 2005 David Estopinal SLI Design, Inc. Fax 713/465-8555 RE: Natches Trace Addition, Lot 1 Block C / Town Center Bank Dear Mr. Estopinal: I was informed today that your company has applied for a Certificate of Occupancy for the referenced project. Please be aware that work permitted under the Construction Development permit has not been accepted by the City of Coppell's Engineering Dept. Your company has not requested a walk-thru inspection from your assigned inspector, Garreth Campbell, nor have you provided the 2-year maintenance bond required by our Subdivision Ordinance to cover infrastructure work done in connection with this project. If you need more information on the requirements for Final Acceptance that will allow you to receive the Certificate of Occupancy in a timely manner, please call me at the number below as soon as possible. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office Phone: 972-304-7044 Fax: 972-304-3570 CCl Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal John Blacker, P.E., Kimley-Hom, Inc. fax 817/335-5070