Loading...
MA0405-LR050708;; .one Engineering Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 236897 Project No.: 0510346 Date of Service: 06/29/2005 Report Date: 07/08/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLAJ~r: 1 SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-I231 ASTM C-39 MIX DESIGN I.D.: 732 PLACEMENT DATE: 06/29/2005 WEATHER CONDITIONS: Clear TIME SAMPLED: 8:17am BATCHTIME: 7:40am TEMPERATURE (F) - AIR 84 F CONCRETE: 81 F TRUCK NO: 277 TICKET NO: 149466 AIR CONTENT (%): 5.0 UNIT WEIGHT (pcl): NA OVERALL PLACEMENT LOCATION: Sandy Lake at parkway, north side SAMPLE LOCATION: 10' west of median center REPORT OF TESTS MEASURED SLUMP (inches) 3.25 Concrete Compressive Cylinder 6" x 12" CYLINDER M~KED DATE SET NO. TESTED AGE DIAMETER (days) (inches) MAXIMUM COMPRESSIVE AREA LOAD STRENGTH (sq.in.) (lbs. force) (psi) FRACTURE TYPE 1 1 07/06/2005 1 2 07/27/2005 1 3 07/27/2005 1 4 Hold Water added at site: Technician: Dan Rogers Report Distribution: (l) City of Coppell (1) City of Coppell 5 gallons 7 6.00 28.26 28 0.00 0.00 28 0.00 0.00 Started: 7:15am 106460 3760 Unbonded Cap Unbonded Cap Unbonded Cap Finished: 9:30am ring Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific saraples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letWrs and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the written approval of Rone Engineering Services, Ltd. 0iSS Page 1 of 1 :{one Eng,neenng Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas~ l?( 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150. Houston, TX 77040 CorporatePhone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235390 Project No.: 0510346 Date of Service: 06/08/2005 Report Date: 07/08/2005 Obtain samples of fresh concrete at the placement locations, pc~'orm required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with appIicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: I SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-3 I ASTM C-143 ASTM C-231 ASTM C-I064 ASTM C~1231 ASTM C-39 MLX DESIGN I.D.: 73 1 PLACEMENT DATE: 06/08/2005 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9:40am BATCH TIME: TEMPERATURE (F) - AIR 86 F CONCRETE: 89 F TRUCKNO: 230 TICKETNO: 148229 AIR CONTENT (%): NA UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Approach into Fire Station #2 at Condor ~nd MacArthur SAMPLE LOCATION: Same 03 above REPORT OF TESTS MEASURED SLUMP (inches) 2.25 Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE SET NO. TESTED MAXIMTJM COMPRESSIVE AGE DIANIETER AREA LOAD STRENGTH (days) (inches) (sq.in.) (lbs. force) (psi) FRACTURE TYPE 1 1 06/15/2005 1 2 07/06/2005 1 3 07/06/2005 1 4 Hold Water added at site: Technician: Doyle Mackey Report Distribution: (I) City of Coppell (1) City of Coppell gallons 7 6.OO 28.26 28 6.00 28.26 28 6.00 28.26 Started: 8:45am 107970 141380 136030 Average 3820 5000 4810 4910 Unbonded Cap Unbonded Cap Unbonded Cap Finished: 10:30am Clay Stark Project Manager LLMITAT]ONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in flail without the written approval of Rone Engineering Services, Ltd. Page 1 ofl Engineering :,:4one Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235512 Project No.: 0510346 Date of Service: 06/09/2005 Report Date: 07/08/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUM~P (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Mobile Crete PLANT: NA SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 M/X DESIGN I.D.: 2 ' MEASURED SLUME PLACEMENT DATE: 06/09/2005 (inch.) WEATHER CONDITIONS: Partly cloudy 8.5 TIME SAMPLED: 12:00pm BATCHTIME: NA TEMPERATURE (F) - AIR Na F CONCRETE: 89 F TRUCK NO: 2022 TIC~.rT NO: 05-575 Am CONTENT (%): 1.5 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Side curbs heading into approach on north and south sides of approach from intersection of Village/Samuel at MacArthar S3dMPLE LOCATION: South curb REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 06/16/2005 7 6.00 28.26 80920 2860 Unbonded Cap 1 2 07/07/2005 28 6.00 28.26 112150 3970 Unbonded Cap 1 3 07/07/2005 28 6.00 28.26 115660 4090 Unbonded Cap Average 4030 1 4 Hold Technician: Joshua Dietz Report Distribution: (1) City of CoppelI (1) City of Coppell Started: 10:45am Finished: 12:45pm Ron~ ~g~~ Project Manager LIMITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shalI not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. MSS Page 1 of 1 one Engineenng 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF CYLINDER COLLECTION Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 Report No.: 237187 Project No.: 0510346 Date of Service: 07/02/2005 Report Date: 07/08/2005 Services: Cylinder Collection Report of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: l:00pm - 2:15pm Page 1 of 1 Technician: Osvaldo Flores Report Distribution: (1) City of Coppell (t) City of Coppell Rone Engineering Clay Stark Project Manager LIMITAT]ONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no conttoL Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~II without the written approval of Rone Engineering Services, Ltd. 99TM Pa~e 1 of 1 i,{one Engineering Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: {214) 630-9745 REPORT OF CYLINDER COLLECTION Report No.: 237262 Project No.: 0510346 Date of Service: 07/06/2005 Report Date: 07/08/2005 Services: Cylinder Collection Report of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 Technician: Randy Nudge Report Distribution: (1) City of Copp¢ll (I) City of Coppell 8:30am - 9:45am Rone Engineering Clay Stark Project Manager LrMLITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject ma~er provided by persons or conditions over which we have no control Our leaers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 99TM Pace I of I