Vista Point II-LR050517 GEOTECHN[CALAND
ENVIRONHENTALCONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 131
REG PROJECT NO. 11685
SAMPLE DATE: 05-17-05
TECHNICIAN: B. Shea
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location I Quantity Represented
1 Decorative pavers ~ west entrance off of Hwy 121 10/20
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Southern Star 9671 4200
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 1094 05-20-05 3 105080 3720
1094 06-24-05 7 128660 4550
1094 06-14-05 28 159720 5650
1094 06-14-05 28 158660 5620 5640
1094 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 1094 5.5 10:15AM 77 91 NA 1045724
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424STUTZ DR. · SUITE400 ,, DALLAS, TX75235 · TE[[214] 3505600" FAX [214] 3500019