Vista Point II-LR050512 REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 123
REPORT DATE: 05-12-05
REG PROJECT NO. 11685
DATE OBSERVED: 04-22-05
TECHNICIAN: M. Wood
PAGE: 1 of 1
Items Observed:
Paving: 0 to 75'N and 0 to 180'E from S.E. corner of
N.E. building corner.
Reference Plans or Notes Used: I Sheet C.5-6
[~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/
Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Odginal Signed By
Ronald F. Reed, P.E.
BW/cn
2424 STUTZ DE. ,, SUITE 400 ,, DALLAS, TX 75235 * TEL [214] 350 5600 '" F^X [214] 3500019