Loading...
Vista Point II-LR050504GEOT£CHNICAL AND I~ F:~ I'-'i I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14660 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 107 REPORT DATE: 05-04-05 REG PROJECT NO. 11685 DATE OBSERVED: 04-05-05 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 Items Observed: ] Paving: 10 to 30'S from 0 to 120'W, 0 to 110'N from 0 to 60'E and 5' to 20'N from 25' to 40'W from S.W. corner of Building 1. Reference Plans or Notes Used: ] Sheet C5.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) (1) (1) (1) (1) (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/ Ms. Beverly Hurtsman Good Fulton Farrell/Mr. Rick Myers McHale Engineering/ Mr. Gary McHale AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/cn 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · tEL [214] 350 5600 · FAX [214] 3500019