Vista Point II-LR050504GEOT£CHNICAL AND I~ F:~ I'-'i I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14660 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 107
REPORT DATE: 05-04-05
REG PROJECT NO. 11685
DATE OBSERVED: 04-05-05
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
Items Observed:
] Paving: 10 to 30'S from 0 to 120'W, 0 to 110'N from 0 to 60'E
and 5' to 20'N from 25' to 40'W from S.W. corner of Building
1.
Reference Plans or Notes Used: ] Sheet C5.1
x IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
Cadence McShane, Corporation/
Mr. Brandon Perdue
Jackson-Shaw Company/
Mr. Christopher Gardner
City of Coppell/
Ms. Beverly Hurtsman
Good Fulton Farrell/Mr. Rick Myers
McHale Engineering/
Mr. Gary McHale
AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/cn
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · tEL [214] 350 5600 · FAX [214] 3500019