Loading...
Vista Point II-LR050428GEOTECHNICAL AND J~ F~ J~ I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation Items Observed: REPORT NO. 114 REPORT DATE: 04-28-05 REG PROJECT NO. 11685 DATE OBSERVED: 04-13-05 TECHNICIAN: R. Whitaker PAGE: 1 of 1 Entire Building 1 Leave-Out. Reference Plans or Notes Used: I Sheet S1 ~-~There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppel[/ Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/mg 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 ,, TEL [214] 3505600 · F^X [214] 3500019