Vista Point II-LR050421GEOTECNNICALAND G ~ G I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 109
REPORT DATE: 04-21-05
REG PROJECT NO. 11685
DATE OBSERVED: 04-08-05
TECHNICIAN: C. Johnson
PAGE: 1 of 1
Items Observed:
Paving: 0 to 95'S and 0 to 200'W from S.E. corner of
Building 1.
]There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/
Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/cn
2424STUTZ DR. ,. SUITE 400 .. DALLAS, TX 75235 * TEL [214] 3505600 '.. ~^X [214] 350 0019