Loading...
Vista Point II-LR050421GEOTECNNICALAND G ~ G I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 109 REPORT DATE: 04-21-05 REG PROJECT NO. 11685 DATE OBSERVED: 04-08-05 TECHNICIAN: C. Johnson PAGE: 1 of 1 Items Observed: Paving: 0 to 95'S and 0 to 200'W from S.E. corner of Building 1. ]There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/ Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/cn 2424STUTZ DR. ,. SUITE 400 .. DALLAS, TX 75235 * TEL [214] 3505600 '.. ~^X [214] 350 0019