Loading...
Vista Point II-LR050414GEOTECHNICAL AND G Jm~ r"l U ~ ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 99 REPORT DATE: 04-14-05 REG PROJECT NO. 11685 TECHNICIAN: M. Shields PAGE: 1 of 1 Proctor ASTM No. Standard D-698 2 D-698 3 D-698 4 D-698 5 D-698 6 D-698 Description Dark brown clay Brown clay w/gravel Dark brown silty clay Dark brown clay w/trace of gravel Dark brown clay (lime-treated) Dark brown clay (lime treated) Optimum Maximum Moisture, % Density, PCF 21.2 99.7 16.3 107.3 20.0 100.4 22.2 95.9 22.3 95.5 22.7 96.4 Test No. Date Location 272 03-29-05 Paving: 40'N, 50'E(1) 273 Paving: 40'N, 40'W(2) 274 Paving: 25'S, 40'E(3) 275 Paving: 40'S, 30'E(2) Depth Field Field Below Final S.G. Density Moisture (feet) (pcf) (%) 0.0 101.3 20.6 0.0 104.2 17.1 0.0 106.2 19.0 0.0 107.4 18.5 Proctor Compaction ID Level (%) 3 100.8 2 97.1 2 98.9 2 100.0 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.W. corner of Building II. (2) Measurements referenced from N.E. corner of Building II. (3) Measurements referenced from S.E. corner of Building II. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 ',' T~L [2]4] 350 5600" F^X [214] 3500019 GEOTEChNiCAL AND ~ F~ O I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 100 REPORT DATE: 04-14-05 REG PROJECT NO. 11685 DATE OBSERVED: 03-30-05 TECHNICIAN: R. Hollings PAGE: 1 of 1 [ Items Observed: Paving: 0-50'S, 0-225'W of N.W. corner of Building III. Paving: 0-240'S, 50-70'W of N.W. corner of Building I1. [ Reference Plans or Notes Used: ] Sheet C5.1 ~]There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/ Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/cn 2424 STUTZ DR. ', SUITE 400 ~. DALLAS, TX 75235 ,* TEL [214] 350 5600 '" FAX [214] 3500019