REPORT OF FIELD DENSITY TESTS
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 99
REPORT DATE: 04-14-05
REG PROJECT NO. 11685
TECHNICIAN: M. Shields
PAGE: 1 of 1
Proctor ASTM
No. Standard
D-698
2 D-698
3 D-698
4 D-698
5 D-698
6 D-698
Description
Dark brown clay
Brown clay w/gravel
Dark brown silty clay
Dark brown clay w/trace of gravel
Dark brown clay (lime-treated)
Dark brown clay (lime treated)
Optimum Maximum
Moisture, % Density, PCF
21.2 99.7
16.3 107.3
20.0 100.4
22.2 95.9
22.3 95.5
22.7 96.4
Test
No. Date Location
272 03-29-05 Paving: 40'N, 50'E(1)
273 Paving: 40'N, 40'W(2)
274 Paving: 25'S, 40'E(3)
275 Paving: 40'S, 30'E(2)
Depth Field Field
Below
Final S.G. Density Moisture
(feet) (pcf) (%)
0.0 101.3 20.6
0.0 104.2 17.1
0.0 106.2 19.0
0.0 107.4 18.5
Proctor Compaction
ID Level (%)
3 100.8
2 97.1
2 98.9
2 100.0
Comments: Where tested, materials were in compliance with project specifications.
Footnotes:
(1) Measurements referenced from N.W. corner of Building II.
(2) Measurements referenced from N.E. corner of Building II.
(3) Measurements referenced from S.E. corner of Building II.
Mail
Distribution:
(1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/Mr. Gary
McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 ',' T~L [2]4] 350 5600" F^X [214] 3500019
GEOTEChNiCAL AND ~ F~ O I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfod Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 100
REPORT DATE: 04-14-05
REG PROJECT NO. 11685
DATE OBSERVED: 03-30-05
TECHNICIAN: R. Hollings
PAGE: 1 of 1
[ Items Observed:
Paving: 0-50'S, 0-225'W of N.W. corner of Building III.
Paving: 0-240'S, 50-70'W of N.W. corner of Building I1.
[ Reference Plans or Notes Used: ] Sheet C5.1
~]There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/
Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/cn
2424 STUTZ DR. ', SUITE 400 ~. DALLAS, TX 75235 ,* TEL [214] 350 5600 '" FAX [214] 3500019