Vista Point II-LR050413 REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 95
REPORT DATE: 04-13-05
REG PROJECT NO. 11685
DATE OBSERVED: 03-24-05
TECHNICIAN: T. Miller
PAGE: 1 of 1
J Items Observed:
J Paving: 10'S to 75'S from 0 to 55'W, 0 to 130'S 35 to
60'E from S.E. corner of Building 3 and 30-130'N, 0-95'E
from N.E. corner of Building 2.
Reference Plans or Notes Used: ] Sheet C5.1
x JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/
Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/mg