Loading...
Vista Point II-LR050413 REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 95 REPORT DATE: 04-13-05 REG PROJECT NO. 11685 DATE OBSERVED: 03-24-05 TECHNICIAN: T. Miller PAGE: 1 of 1 J Items Observed: J Paving: 10'S to 75'S from 0 to 55'W, 0 to 130'S 35 to 60'E from S.E. corner of Building 3 and 30-130'N, 0-95'E from N.E. corner of Building 2. Reference Plans or Notes Used: ] Sheet C5.1 x JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/ Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/mg footfoot