Vista Point II-LR050401GEOTECHNICALAND ~ R r'"l I I F==
ENVIRONP~ENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 102
REG PROJECT NO. 11685
SAMPLE DATE: 04-01-05
TECHNICIAN: J. Gray
CONTRACTOR: Cadence McShane Corporation
L_~c~tion of Sample
Set Number [ Location
1
East Dumpster Piers
I Quantity Represented
10/20
Specified Strength p.s.i.
3000
Desitin Information
Source of Concrete
Southern Star
Mix Identification
9337
Test Results
Set Cylinder Age@ Total Load Compressive Average
N . I ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
~ 8514 04-08-05 7 128420 4540
8514 04-08-05 7 131620 4660 4600
8514 04-29-05 28 164820 5830
8514 04-29-05 28 171720 6080 5960
Cylinder Data
Set Cylinder
No. ] ID Slump
1 8514 5.0
Time of I Concrete Air Ticket
Sample Air Temp. Temp. Entrainment Number
2:30PM 74 77 NA 773577
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppelt/Ms. Beverly Hurtsman
(1) Good Fulton Farretl/Mr, Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 3505600 · r^x [214] 3500019