Vista Point II-LR050330GEOTECHNICAL AND G R r"l U jc~J ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 84 REPORT DATE: 03-30-05 REG PROJECT NO. 11685 DATE OBSERVED: 03-03-05 TECHNICIAN: P. Becerra PAGE: 1 of 1 [ Items Observed: ] Paving: 50-92'S, 0-507'from west entrance on Highway 121. [ Reference Plans or Notes Used: ] Sheet C5.1 I x 1There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1 (1 (1 (1 (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/ Ms. Beverly Hurtsman Good Fulton Farrell/Mr. Rick Myers McHale Engineering/ Mr. Gary McHale AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Odginal Signed By Ronald F. Reed, P.E. BW/cn 2424STUTZ DR. * SUITE400 * DALLAS, TX 75235 * TEL[214]3505600" FAX [21413500019 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. D Slump Sample Air Temp. Temp. Entrainment Number 1 7485 5.0 7:45AM 46 54 4.0 764349 2 7486 5.0 8:45AM 54 62 4.0 764360 3 7487 5.0 10:00AM 50 68 4.0 764368 4 7488 5.0 11:45AM 59 65 4.0 764382 5 7489 5.0 12:45AM 58 63 4.0 764390 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.MT. KEA/Inc GEOTECHN~CALAND ~ I~ ~ I I F:~ ENVIRONMENTAL CONSULTANTS REPORT OF FIELD GRADATION TESTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montrort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 88 REPORT DATE: 03-30-05 REG PROJECT NO. 11685 TECHNICIAN: R. Whitaker PAGE: 1 of 1 Specification ] Sieve Size I Percent Passing (%) I Sieve Size I Percent Passing (%) 1-3/4" 100 3/4" 85 Passing Passing Date Location 1-3/4" Sieve 3/4" Sieve 03-14-05 Deceleration Ln: 150'N(1) 100 85 Deceleration Ln: 150'N, 120'E(1) 100 86 Approach: 120'S, 90'E(2) 100 85 Approach: 60'N, 30'W(1) 100 86 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.W. building corner. (2) Measurements referenced from S.W. building corner. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR. · SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 * F^X [214] 3500019 GEOTECHNICALAND G F=;J r--I I I J== ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation J Items Observed: REPORT NO. 90 REPORT DATE: 03-30-05 REG PROJECT NO. 11685 DATE OBSERVED: 03-15-05 TECHNICIAN: C. Johnson PAGE: 1 of 1 ] Paving: 0-630'W, 0-135'E from N.E. corner of Building 2. Reference Plans or Notes Used: ] Sheet C-2 J x ]There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) (1) (1) (1) (1) (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/ Ms. Beverly Hurtsman Good Fulton Farrell/Mr. Rick Myers McHale Engineering/ Mr. Gary McHale AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/mg 2424STUTZ DR. * SUITE400 · DALLAS, TX75235 ,, TE[[214] 3505600" F^X [21413500019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway 12'1 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation Proctor ASTM No. Standard Description REPORT NO. 91 REPORT DATE: 03-30-05 REG PROJECT NO. 11685 TECHNICIAN: M. Silvia PAGE: 1 of 1 Optimum Maximum Mo sture, % Density, PCF D-698 2 D-698 3 D-698 4 D-698 5 D-698 6 D-698 Dark brown clay Brown clay w/gravel Dark brown silty clay Dark brown clay w/trace of gravel Dark brown clay (lime-treated) Dark brown clay lime treated 21.2 99.7 16.3 107.3 20.0 100.4 22.2 95.9 22.3 95.5 22.7 96.4 Test No. Date Location 270 03-16-05 Deceleration Lane: 40'E(1) 271 Deceleration Lane: 95'W(2) Depth J Field Field Below J Final S.G. Density Moisture Proctor (feet) (pct') (%) D 0.0 91.8 24.7 6 0.0 92.6 22.8 6 Compaction Level (%) 95.2 96.1 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from west end. (2) Measurements referenced from east end. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/mg 2424 STUTZ DR. ,, SUITE 400 ,, DALLAS. TX 75235 ,, TEL [214] 3505600 * FAX [214] 3500019 GEOTECHNICALAND ~ F~ r-'l U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 101 REG PROJECT NO. 11685 SAMPLE DATE: 03-30-05 TECHNICIAN: R. Hollings CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location Quantity Represented 1 2 3 4 Paving: 20'S, 50'W of NW corner of Bldg. 3 20/350 Paving: 45'S, 95'W of NW corner of Bldg. 3 110/350 Paving: 25'S, 180'W of NW corner of Bldg. 3 210/350 Paving: 115'S, 65'W of NW corner of Bldg. 2 310/350 Design Information Source of Concrete I Mix Identification ] Specified Strength p.s.i. Southern Star 9339 3500 Test Results Set Cylinder Age @ Total Load Compressive Average No. D Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8348 04-06-05 7 101210 3580 8348 04-27-05 28 120280 4260 8348 04-27-05 28 117530 4160 4210 8348 Hold H 2 8349 04-06-05 7 99740 3530 8349 04-27-05 28 123590 4370 8349 04-27-05 28 120610 4270 8349 Hold H 3 8350 04-06-05 7 89110 3150 8350 04-27-05 28 113440 4020 8350 04-27-05 28 116560 4130 8350 Hold H 4 8351 04-06-05 7 85790 3040 8351 04-27-05 28 105130 3720 8351 04-27-05 28 109440 3870 8351 Hold H 4320 4O8O 3800 2424STUTZ DR. ,. SUITE400 · DALLAS, TX75235 · TEL[214]3505600 ~* F^X [2141350 0019 ,~ylinder Data Set Cylinder Time of Concrete No. ID Slump Sample Air Temp. Temp. 1 8348 4.0 7:25AM 56 60 2 8349 4,0 8:00AM 60 64 3 8350 4.5 9:25AM 65 68 4 8351 4.5 10:35AM 68 74 Air Ticket Entrainment Number 4.8 773489 5.4 773499 5.3 773509 5.4 782959 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KEA/Inc