Loading...
Vista Point II-LR050317GEOTECHNICALAND G jc=j r"l i i p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 81 REPORT DATE: 03-17-05 REG PROJECT NO. 11685 DATE OBSERVED: 03-07-05 TECHNICIAN: F. Thornton PAGE: 1 of 1 [ Items Observed: J Far west paving area, west of Building 1. [ Reference Plans or Notes Used: I Sheet C-5.1 [List Deviations Noted: Spacing of rebar too wide at various locations. The noted deviations were repoded to: Pancho with Master Construction ~The noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) (1) (1) (1) (1) (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/ Ms. Beverly Hudsman Good Fulton Farrell/Mr. Rick Myers McHale Engineering/ Mr. Gary McHale AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 350 5600" F^X [214] 3500019