Vista Point II-LR050317GEOTECHNICALAND G jc=j r"l i i p
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 81
REPORT DATE: 03-17-05
REG PROJECT NO. 11685
DATE OBSERVED: 03-07-05
TECHNICIAN: F. Thornton
PAGE: 1 of 1
[ Items Observed:
J Far west paving area, west of Building 1.
[ Reference Plans or Notes Used: I Sheet C-5.1
[List Deviations Noted:
Spacing of rebar too wide at various locations.
The noted deviations were repoded to: Pancho with Master Construction
~The noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
Cadence McShane, Corporation/
Mr. Brandon Perdue
Jackson-Shaw Company/
Mr. Christopher Gardner
City of Coppell/
Ms. Beverly Hudsman
Good Fulton Farrell/Mr. Rick Myers
McHale Engineering/
Mr. Gary McHale
AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/rs
2424 STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 350 5600" F^X [214] 3500019