ST9302-CN 981208~utas~~ ~~~~~ AGENDA REQUEST FORM ~ ~~3~ ° ~ CITY COUNCIL MEETING: December 8 1998 ITEM # ITEM CAPTION: Consider approval of an agreement with TU Electric for the relocation of a transmission power pole in an amount not to e~:eeed $15,000.00; and authorizing the Mayor to sign. SUBMITTED BY: ICen Griffin, P.E. TITLE: Director of Engineering/Public Works STAFF RECOMMENDS: APPROVAL STAFF COMMENTS: See attached memo. ~ ;~~i~ I ~ a~ ~~ ~"' ~, ~, w/%~~' ~~~~~ ~. ~~~ i~, u ~<< ~~ ^~~i. I~,~ , ~°~ F; j~~~: BUDGET AMT. ~ AMT. EST. ~ +/- BUD:$ FINANCIAL COMMENTS: DIR. INITIALS: 1~i FIN. REVIEW: CITY MANAGER REVIEW: Agenda Request Form -Revised 3/98 Document Name: #engt `~ ~ MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: RE: Date: Mayor and City Council Ken Griffin, P.E., Director of Engineering and Public Works W Consider approval of an agreement with TU Electric for the relocation of a transmission power pole in an amount not to exceed $15,000.00; and authorizing the Mayor to sign. December 8, 1998 During the design of Sandy Lake Road, the roadway was shifted northwazd in an attempt to avoid the transmission power lines on the south side of Sandy Lake Road. Even though the roadway was shifted and for the most part the existing transmission corridor is being maintained on the south side of Sandy Lake Road there are still several transmission poles that need to be relocated. Approximately 350 feet east of Heartz Road there is a bend in the transmission line that bend necessitates having a stub pole on the north side of Sandy Lake Road with a span wire across Sandy Lake Road. This agreement will replace the wooden pole on the south side with a concrete pole and eliminate the need for the span wire across Sandy Lake Road and the stub pole on the north side. Sometime after the first of the year, there will be an additional agenda item brought forth to relocate several other transmission power poles that fall in radius for streets along the south side. To eliminate some of the visual clutter across Sandy Lake Road, staff recommends approval of this agreement with TU Electric in the amount not to exceed $15,000.00. Staff will be available to answer any questions at the council meeting. "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN" ,~'~ rJ Future pp Bpx478 7r,~pi9 Comp, Texas 2i4-462-~~ 'e ~~Witn ~e~~~ ~, ~ro ~} Q--~ >~ ~-~- ~~ ~~ri~ ~ ~ ~ ~,~ ~ : ~^ ~ o~ ~ ~~ ~' ~l~~ ~ ~ ~ ~~~~-r ~ ~~ ~ ~ ~~ 1 ~ ~~u -~ ~~ ~' ~, ~ ~ '~, . .. ~'` '7 ~ s ~ ~~~ ~, ~~2~ ~,~.~^ DEC 11 ,' 98 12~ 06 FR~I CHOLS JCKSON DLL D0 214 %5 0010 J"~ 9723043570 r~ NICHOLS, JACKSON, DILLARD, HAGER & SMITH, L.L.P. 1800 I.n~coLN Ptwz.A 500 N. AtcwRD DA1,LA3, TE7CAS 75201 (214) 965 9900 {214) 965.0010 FAX FACSIIVIII.E COVER SHEET PLEASE DELIVER TSE FOLLOWING TO: NAME: Ken C>~n A . ' COMPANY: City of CoppeA ~,1 FAX NO.: 972!304-3570 DATE: Decembar 11, 1998 FROM. Pcter G. Smlth 1, TRANSMTITED BY: They Le NiTMBER OF PAGES (I~civding Cover Sbeet): C011~MENTS: P.01i01 ~a~fs~~~ /~ ~~~ Q~ --- ~~ Contract is ok. Pete. 1 ~ p ~. ~r~~' ~~~~ ~~ ~ ~~~o~ ~ G ~ p v1l~ S 1, t.~.yt~ t~2.e . ,/ K~ t.. IF YOU DO NOT RECEIVE ALL THE PAGES. PLEASE CALL: THUY T (21465-3325 t~=-~ ~,: . THE IIJPORMATION CONTAINEb IN TFIIS FACSII~tII.E IS ATTORNEY PRIVIIF.GED AND OONFIDEN'Y'IAI. IIVFORIdATION IIVTENDED ONLY P'OR THE USE OJ< TliE INDIVIDUAL 0>< EtQTITY NAi~D ABOVE. IF THE RECIPIENT IS NOT T'FI>; IN7LN' DED RECIPff1VT. YOU ARE HEREBY NOTTFffA THAT ANY DIS'I'R~tTrION, DJSSEbIINATION OR COPYII~IG OF TfIIS COMAICINICI-AON IS 87WCTLY PROIIlETfED. IF YOU I{AVE RECEIVED THIS IIr ERROR PLEASE NOTffY U3 I14~~DIATELY BY PHONE AND RSi'URN TFIE ORIGINAL A~ESSAGB TO US AY THE ABOVE ADDRESS V1A THE U.S. POSTAL SERVICE. ** TOTAL PAGE.01 ~ .. , r '~ Tt/E/ectric =Lone Star Gas T o x a• U t l l i t l o• C o m p o n l o• Tim Brancheau Account Manager - Coppell Farmers Branch OJjSce November 19, 1998 Mr. Jim Witt City Manager City of Coppell P. O. Box 478 Coppell, TX 75019 Dear Jim: Enclosed are two (2) copies of our agreement for the removal of a wood transmission stub pole and its associated pole structure interfering with the Sandy Lake Road project. It is proposed to install one (1) concrete structure in its place. Upon signature of this agreement by the City of Coppell, TU Electric will proceed with the design and construction of the project. Upon completion of the project, the City of Coppell shall pay the actual cost of the project as designed, a total cost not to exceed $15,000.00 (see page 2, paragraph 7). Please call me at 888-1307 should you have any questions. Thank , f Tim Brancheau TB:jrm Enclosure - As stated 14400 Josey Lane Farmers Branch, Texas 75234 ` ~, z TEXAS UTILITIES ELECTRIC COMPANY CITY OF COPPELL, TEXAS CONTRACT FOR ADJUSTMENTS TO TEXAS UTILITIES ELECTRIC COMPANY'S TRANSMISSION FACILITIES TO ACCOMMODATE IMPROVEMENTS TO SANDY LAKE ROAD Texas Utilities Electric Company, hereinafter referred to as "Company", and the City of Coppell, Texas, hereinafter referred to as "City" agree as follows: City desires to reconstruct Sandy Lake Road from East of Denton Tap to West of MacArthur Boulevard. Work associated with this construction, will be referred to hereinafter as the "Project". Company owns a transmission line, known as the Coppell -Apollo 69kV Transmission Line, which will be affected by the Project requiring relocation and adjustment to these facilities. The transmission line effected by the Project is located within Company's easement. 2. City shall not commence construction work on the Project until Company has granted City encroachment rights, pursuant to written agreement, permitting City to utilize Company's easements. 3. Company shall relocate and adjust its transmission line to accommodate the Project at City's expense, as hereinafter provided. Actual and detailed plans for relocation and adjustment of Company's transmission line are described in the drawing attached hereto as Exhibit "A". Those plans detail replacement of one (1) single wood pole structure with one (1) taller single concrete structure and the removal of one span guy, one down guy and one stub pole to provide adequate vertical and horizontal clearances between the transmission line and the roadway. 4. All locations and adjustments are based upon the elevations as supplied by Kimley -Horn and Associates, Inc., City's engineering contractor on February 13,1998. In the event those elevations and !or the location of the road reconstruction are changed and the change (s) affect Company's facilities and /or line clearances, in addition to those shown on Exhibit "A",the City will be required to pay for any realtering of the transmission line facilities in addition to the work described in the preceding paragraph. 5. Following execution of this contract by both parties, Company will diligently pursue all work necessary to complete the transmission adjustment work described above. City agrees and acknowledges that Company shall not be held liable for failure to perform due to weather conditions or other circumstances which make it inadvisable to reconstruct the transmission line, regulatory delays, intervention, inability to procure materials or delays in obtaining or transportation of material, government restrictions, design changes at request of City, strikes and labor disputes, or for any other circumstances beyond the reasonable control of Company. 6. City may terminate this contract by providing thirty (30) days written notice to Company. If City chooses, for any reason, to terminate this contract, City shall be responsible for reimbursement to Company for all actual costs incurred by Company up to the date of termination, including material costs, overheads, shipping costs, labor, restocking charges and penalties. City further agrees to pay for all costs necessary to restore Company's facilities to their previously existing condition or to a condition acceptable to Company, whichever is less costly. 7. City shall pay Company for its costs incurred in relocating and adjusting Company's facilities pursuant to the terms of this Contract. Company shall submit invoices to City and City shall remit payment to Company within thirty (30) days of receipt of invoices. Any invoices that remain unpaid after (30) days shall accrue interest at the rate of 1% per month on the outstanding balance until paid, which accrued interest shall be paid to Company. Total cost shall not exceed $15,000.00, provided, however, that in the event City requires any change of plans which result in Company incurring costs in excess of $15,000.00, City shall pay any additional costs to Company. Related indirect (overhead) costs shall be 20% of total actual direct costs and this rate shall apply to all work performed by Company as a result of the Project. 8. City shall indemnity and hold harmless Company from and against any and all claims, causes of action, suits, and demands, whether in contract or tort or otherwise, and whether seeking restitution for personal injury, including death, or property damage, or attorney's fees, brought or made against Company resulting from the City's performance of the terms and conditions of this Contract. 9. Company shall retain the right to cut, remove, and trim trees, bushes, and any other vegetation within or extending into Company's rights of way which, in the sole judgement of Company, interferes with the maintenance, repair, relocation, reconstruction, inspection, or removal of Company's facilities. Company also shall retain the right to remove and prevent the construction or installation of any improvements or impediments located within or extending into Company's rights of way. This Contract embodies the complete agreement between Company and City and supersedes any oral or written understandings and agreements between the parties. This Contract may only be amended, in writing signed by both parties. Effective the ~l day of ,1998. City of Coppell, Texas By: Name: ~ Ll/~ Title: G r Attes City Secretary Texas Utilities Electric Company By: Name: Vic Zemanek APPROVED AS TO FORM: By: City Att rney Title: Transmission Engineering Manager