Vista Point II-LR050308CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 85
REG PROJECT NO. 11685
SAMPLE DATE: 03-08-05
TECHNICIAN: G. Tsougarakis
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 20'N, 80'W of NW corner of Bldg. 2 30/500
2 Paving: 160'N, 85'W of NW corner of Bldg. 2 140/500
3 Paving: 220'N, 85'W of NW corner of Bldg. 2 210/500
4 Paving: 60'S, 30'W of SE corner of Bldg. 1 330/500
5 Paving: 100'S, 60'W of SE corner of Bldg. 1 410/500
Desitin Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Southern Star 9327 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 7485 03-15-05 7 87600 3100
7485 04-05-05 28 107320 3800
7485 04-05-05 28 109880 3890 3850
7485 Hold H
2 7486 03-15-05 7 82320 2910
7486 04-05-05 28 110380 3910
7486 04-05-05 28 113240 4010 3960
7486 Hold H
3 7487 03-15-05 7 67020 2370
7487 04-05-05 28 93940 3330
7487 04-05-05 28 87690 3100 3220
7487 Hold H
4 7488 03-15-05 7 76070 2690
7488 04-05-05 28 101480 3590
7488 04-05-05 28 106230 3760 3680
7488 Hold H
5 7489 03-15-05 7 75160 2660
7489 04-05-05 28 101590 3600
7489 04-05-05 28 105710 3740 3670
7489 Hold H
2424STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL [214] 3505600 · F^×[21413500019