Loading...
Vista Point II-LR050304CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 83 REG PROJECT NO. 11685 SAMPLE DATE: 03-04-05 TECHNICIAN: D. Rico CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location Quantity Represented 1 2 Paving: 45'N, 30'W of SW corner of Bldg. 1 Paving: 205'N, 100'E of SW corner of Bldg. 1 Desitin Information Source of Concrete I Mix Identification Southern Star 9327 30/160 130/160 Specified Strength p.s.i. 3000 Test Results Set Cylinder Age @ Total Load No. ID Date Tested Test lbs. 1 7389 03-11-05 7 76240 7389 04-01-05 28 104420 7389 04-01-05 28 109780 7389 Hold H Compressive Average Strength p.s.i. Strength p.s.i. 2700 3700 3890 3800 2 7390 03-11-05 7 96820 3430 7390 04-01-05 28 128560 4550 7390 04-01-05 28 125150 4430 7390 Hold H 4490 Cylinder Data Set Cylinder Time of No. I ID Slump Sample AirTemp. ~ 7389 5.0 8:00AM 51 7390 5.0 8:50AM 52 Concrete Air Ticket Temp. Entrainment Number 63 5.0 591231 67 5.0 591240 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale (1) AECC, Inc./Mr. Chad Stephens Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.MT. KEA/Inc 2424STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,, TEl [214] 3505600" FAX [214] 3500019