Loading...
Vista Point II-LR050303 REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 77 REPORT DATE: 03-03-05 REG PROJECT NO. 11685 TECHNICIAN: R. Whitaker PAGE: 1 of 1 Proctor ASTM Optimum Maximum No. Standard Description Mo sture, % Density, PCF 1 D-698 Dark brown clay 21.2 99.7 2 D-698 Brown clay w/gravel 16.3 107.3 3 D-698 Dark brown silty clay 20.0 100.4 4 D-698 Dark brown clay w/trace of gravel 22.2 95.9 5 D-698 Dark brown cia}' (lime-treated) 22.3 95.5 Below J Field J Field Final S.G. Densityl Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID ~ Level (%) 255 02-16-05 Borrow Pit: 6'N, 231'E(1) 1.0 96.7 24.0 1 97.0 256 Borrow Pit: 6'N, 270'E(1 ) 1.0 96.6 23.9 1 96.9 257 Borrow Pit: 6'N, 330'E(1 ) 1.0 94.9 24.2 1 95.2 258 02-17-05 Borrow Pit: 5'N, 240'E(1) 0.5 105.2 17.9 2 98.1 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.E. corner south building. Mail Distribution: (1) (1) (1) (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/Ms. Beverly Hudsman Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT AE/cn 2424STUTZ DR, .. SUITE 400 .. DALLAS, TX 75235 .. TEL [214] 3505600 .. F^X [214] 3500019