Loading...
Vista Point II-LR050228 REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway '121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation Proctor ASTM No. Standard 1 D-698 2 D~698 3 D-698 4 D-698 5 D-698 Description Dark brown clay Brown clay w/gravel Dark brown silty clay Dark brown clay w/trace of gravel Dark brown clay (lime-treated) Test No. Date Location REPORT NO. 75 REPORT DATE: 02-28-05 REG PROJECT NO. 11685 TECHNICIAN: M. Silva & B. Febinger PAGE: 1 of 1 Optimum Maximum Moisture, % Density, PCF 21.2 99.7 16.3 107.3 20.0 100.4 22.2 95.9 22.3 95.5 Proctor Compaction ID Level (%) Depth Below I Field Field Final S.G. Density Moisture (feet) (pcf) ("/o) 245 246 247 248 249 250 251 252 253 254 02-11-05 Storm Line C: STA 1 +89 1.0 94.9 24.2 1 Storm Line C: STA 3+39 1.0 97.5 21.8 1 Storm Line C: STA 4+89 1.0 95.3 23.6 1 Storm Line C: STA 6+39 1.0 96.2 22.2 1 Paving: 75'N, 40'W(1) 1.0 101.4 21.1 1 Paving: 75'N, 70E(1) 1.0 105.0 21.3 1 Paving: 75'N, 50'W(2) 2.0 102.7 21.4 1 Paving: 80'N, 50'W(2) 1.0 103.4 22.0 1 Paving: 75'N, 30'E(2) 2.0 104.2 22.5 1 Paving: 85'N, 25'E(2) 1.0 100.3 22.6 1 95.1 97.7 95,5 96.4 94.5 97.9 95.7 96.4 97.1 93.5 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.W. corner of Building 2. (2) Measurements referenced from N. E. corner of Building 2. Mai Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/rs 2424STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 3505600 · FAX [214] 3500019