Vista Point II-LR050217GEOTECNNICAL AND ~ jc~j r--I I I p
£NVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 12'1 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 78
REG PROJECT NO. 11685
SAMPLE DATE: 02-17-05
TECHNICIAN: L. Rivera
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location I Quantity Represented
1 Panel: #24, Bldg. 1 30/340
2 Panel: #6, Bldg. 2 110/340
3 Panel: #23, Bldg. 2 210/340
Design Information
Source of Concrete I Mix Identification
Southern Star 9349
Specified Strength p.s.i.
4000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Stren~lth p.s.i. Stren~lth p.s.i.
1 6962 02-24-05 7 124960 4420
6962 03-17-05 28 173970 6160
6962 03-17-05 28 172300 6100 6130
6962 Hold H
2
6963 02-24-05 7 111000 3930
6963 03-17-05 28 155680 5510
6963 03-17-05 28 159080 5630
6963 Hold H
3
6964 02-24-05 7 134510 4760
6964 03-17-05 28 173030 6120
6964 03-17-05 28 171320 6060
6964 Hold H
5570
6090
Cylinder Data
Set Cylinder
NO. I
1 6962
2 6963
3 6964
Time of Concrete Air Ticket
Slump Sample Air Temp. Temp. Entrainment Number
5.00 7:30AM 48 60 NA 782748
5.00 8:45AM 49 62 NA 782756
4.75 10:15AM 49 62 NA 782767
2424STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 3505600 · FAX [214] 3500019