Loading...
Vista Point II-LR050214 REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 65 REPORT DATE: 02-14-05 REG PROJECT NO. 11685 TECHNICIAN: L. Rivera PAGE: 1 of 1 Proctor ASTM No. Standard 1 D-698 2 D-698 3 D-698 4 D-698 5 D-698 Description Dark brown clay Brown clay w/gravel Dark brown silty clay Dark brown clay w/trace of gravel Dark brown clay (lime-treated) Optimum Maximum Moisture, % Density, PCF 21.2 99.7 16.3 107.3 20.0 100.4 22.2 95.9 22.3 95.5 Test No. Date Location 228 01-24-05 Water Line: 2'S, 20'E(1) 229 Water Line: 2'S, 21'E(1) 230 Water Line: 2'S, 22'E(1) 231 Water Line: 35'S, 40'W(2) 232 Water Line: 35'S, 41 'W(2) BelowDepth Field Field Final S.G. Density Moisture Proctor (feet) (pcf) (%) ID 3.25 97,4 25.1 1.0 96.6 25.4 1 0.0 100.9 21.5 1 3.0 96.6 24.2 1 2.0 97.6 23.3 1 Compaction Level (%) 97.7 96.9 101.2 96.9 97.7 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from S.E. corner of Building 2. (2) Measurements referenced from S.W. corner of Building 3. Mail Distribution: McHale (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/Mr. Gary Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/mg 2424STUTZ DR, · SUITE 400 · DALLAS, TX 75235 * TEL [214] 3505600" FAX [214] 3500019