Vista Point II-LR050124CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 57
REG PROJECT NO. 11685
SAMPLE DATE: 01-24-05
TECHNICIAN: Contractor
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location
1 Sanitary Sewer Junction Box: Line B, STA 0+14
Quantity Represented
NA
Design Information
Source of Concrete
NA
Mix Identification I Specified Strength p.s.i.
NA NA
Test Results
Set Cylinder Age @ Total Load Compressive Average
N . I ID DateTested Test lbs. Strength p.s.i. Strength p.s.i.
~ 6417 01-31-05 7 103260 3650
6417 02-21-05 28 137490 4870
6417 02-21-05 28 134510 4760 4820
6417 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 6417 NA NA NA NA NA NA
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrelt/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 .* TEL [214] 350 5600 · FAX [214] 350 0019