Loading...
Vista Point II-LR050118(~EOTECHNICALAND ~ F~J r-'l I I p ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Pier: A-5, Bldg. #2 REPORT NO. 52 REG PROJECT NO. 11685 SAMPLE DATE: 01-18-05 TECHNICIAN: F. Thornton, Jr. r Quantity Represented NA Design Information J Source of Concrete Southern Star Mix Identification I Specified Strength p.s.i. 9337 3000 Compressive Average Strength p.s.i. 7 102390 3620 7 100100 3540 28 146860 5200 28 132810 4700 H Test Results Set Cylinder J Age@ J Total Load No. ID Date Tested Test lbs. 1 6073 01-25-05 6073 01-25-05 6073 02-15-05 6073 02-15-05 6073 Hold Strength p.s.~. 3580 4950 Cylinder Data Set Cylinder J Time of I Concrete J Air Ticket N1o. ID Slump Sample Air Temp. Temp. Entra nment Number 6073 5.25 4:50PM 45 55 NA NA Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KENInc 2424STUTZ DR, · SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 ,, F^X [214] 3500019