Vista Point II-LR050118(~EOTECHNICALAND ~ F~J r-'l I I p
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location
1 Pier: A-5, Bldg. #2
REPORT NO. 52
REG PROJECT NO. 11685
SAMPLE DATE: 01-18-05
TECHNICIAN: F. Thornton, Jr.
r Quantity Represented
NA
Design Information
J Source of Concrete
Southern Star
Mix Identification I Specified Strength p.s.i.
9337 3000
Compressive Average
Strength p.s.i.
7 102390 3620
7 100100 3540
28 146860 5200
28 132810 4700
H
Test Results
Set Cylinder J Age@ J Total Load
No. ID Date Tested Test lbs.
1 6073 01-25-05
6073 01-25-05
6073 02-15-05
6073 02-15-05
6073 Hold
Strength p.s.~.
3580
4950
Cylinder Data
Set Cylinder J Time of I Concrete J Air Ticket
N1o. ID Slump Sample Air Temp. Temp. Entra nment Number
6073 5.25 4:50PM 45 55 NA NA
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KENInc
2424STUTZ DR, · SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 ,, F^X [214] 3500019