Loading...
Vista Point II-LR050117GEOTECHNICAL AND ~ J:==J ~ U j=m ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 32 REPORT DATE: 01-17-05 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (fi) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 2 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No. 12-10-04 Bldg 2 5,400 125 4 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424 STUTZ DE. ,. SUIT~ 400 · DALLAS, TX 75235 · TEL [214] 350 5600 ,, F^X [214] 3500019 GEOTECHNICALAND ~ ~ ~ I I p ENVl ~,ON ~IENTAL CONSULTANTS REPORTED TO: CONTRACTOR: REPORT OF FIELD GRADATION TESTS Vista Point II, Phase I Highway 12'1 and MacArthur Boulevard Coppell, Texas Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue Cadence McShane Corporation REPORT NO. 33 REPORT DATE: 01-17-05 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 Specification Sieve Size I Percent Passin9 (%) I Sieve Size I Percent Passing (%) 1-3/4" 100 #4 60 Passing Passing Date Location 1-3/4" Sieve ~, Sieve 12-14-04 Bldg Pad 2: 15'S, 40'E(1) Bldg Pad 2: 25'S, 60'E(1) Bldg Pad 2: 60'S, 75'E(1) Bldg Pad 2: 80'S, 120'E(1) Bldg Pad 2: 100'S, 100'E(1) 100 100 100 100 100 (*) Test did not meet specifications. Footnote: (1) Measurements referenced from N.W. building corner. Mail Distribution: (1)Cadence McShane, Corporation/ Mr. Brandon Perdue (1 Jackson-Shaw Company/ Mr. Christopher Gardner (1 City of Coppell/Ms. Beverly Hurtsman (1 Good Fulton Farrell/Mr. Rick Myers 48 (*) 52 (*) 50 (*) 48 (*) 49 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT AE/cn 2424STUTZ DR. *, SUITE400 ", DALLAS, TX75235 ,, TEL [214] 3505600 * F^X [214] 3500019 ENVIP, ONH[NTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane Corporation REPORT NO. 34 REPORT DATE: 01-17-05 REG PROJECT NO. 11685 TECHNICIAN: M. Shields PAGE: 1 of 1 Proctor ASTM No. Standard 1 D-698 2 D-698 3 D-698 Optimum Maximum Description Moisture, % Density, PCF TNe~.t Dark brown clay 21.2 99.7 Brown clay w/gravel 16.3 107.3 Dark brown silty clay 20.0 100.4 Date Location 12-17-04 Sanitary Line A: STA 1+00 Depth J Field Below J Field Final S.G. Density Moisture (feet) (pcf) (%) 3.0 96.5 22.0 Proctor Compaction ID Level (%) 1 96.7 Comments: Where tested, materials were in compliance with project specifications. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT AE/cn 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 3505600 "' F^X [214] 350 0019 GEOTECHNiCALAND ~ ~ E~I I I p ENV}RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 49 REG PROJECT NO. 11685 SAMPLE DATE: 01-17-05 TECHNICIAN: F. Thornton, Jr. CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Pier: F.5-5, Bldg. 2 Quantity Represented 10/10 Design Information Source of Concrete Southern Star Mix Identification I 9337 Specified Strength p.s.i. 3000 Test Results Set Cylinder Age @ Total Load No. ID Date Tested Test lbs. 1 6070 01-24-05 7 113820 6070 01-24-05 7 115660 6070 02-14-05 28 132380 6070 02-14-05 28 129460 6070 Hold H Compressive Average Strength p.s.i. Strength p.s.i. 4030 4090 4060 4690 4580 4640 Cylinder Data Set Cylinder Time of Concrete No. ID Slump Sample Air Temp. Temp. 1 6070 5.25 4:15PM 46 55 Air Ticket Entrainment Number NA 751565 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KENInc 2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TELl21413505600 ' F^X [2141350 0019