Vista Point II-LR050114GEOTECHNICALAND G F~I r-1 I I F~~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 48
REG PROJECT NO. 11685
SAMPLE DATE: 01-14-05
TECHNICIAN: F. Thornton, Jr.
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location
1 Pier: A-2.9
Quantity Represented
50/50
Mix Identification
Design Information
Source of Concrete I
Southern Star 9337
Test Results
Specified Strength p.s.i.
3000
Set Cylinder Age @ Total Load
No. ID Date Tested Test lbs.
1 5952 01-21-05 7 105370
5952 01-21-05 7 103620
5952 02-11-05 28 156610
5952 02-11-05 28 153320
5952 Hold H
Compressive Average
Strength p.s.i. Strength p.s.i.
3730
3670 370O
5540
5430 5490
Cylinder Data
Set Cylinder Time of Concrete
No. I ID Slump Sample Air Temp. Temp.
1 5952 5.25 2:45PM 62 68
Air Ticket
Entrainment Number
NA 763664
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
Cadence McShane, Corporation/
Mr. Brandon Perdue
Jackson-Shaw Company/
Mr. Christopher Gardner
City of Coppell/Ms. Beverly Hurtsman
Good Fulton Farrell/Mr. Rick Myers
McHale Engineering/
Mr. Gary McHale
Submitted by:
REED ENGINEERING GROUP, LTD.
original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424SYUTZ DR. · SUITE400 ,, DALLAS, TX75235 · ~L [2141350 5600 " F^X [214] 3500019