Loading...
Vista Point II-LR050114GEOTECHNICALAND G F~I r-1 I I F~~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 48 REG PROJECT NO. 11685 SAMPLE DATE: 01-14-05 TECHNICIAN: F. Thornton, Jr. CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Pier: A-2.9 Quantity Represented 50/50 Mix Identification Design Information Source of Concrete I Southern Star 9337 Test Results Specified Strength p.s.i. 3000 Set Cylinder Age @ Total Load No. ID Date Tested Test lbs. 1 5952 01-21-05 7 105370 5952 01-21-05 7 103620 5952 02-11-05 28 156610 5952 02-11-05 28 153320 5952 Hold H Compressive Average Strength p.s.i. Strength p.s.i. 3730 3670 370O 5540 5430 5490 Cylinder Data Set Cylinder Time of Concrete No. I ID Slump Sample Air Temp. Temp. 1 5952 5.25 2:45PM 62 68 Air Ticket Entrainment Number NA 763664 Mail Distribution: (1) (1) (1) (1) (1) Cadence McShane, Corporation/ Mr. Brandon Perdue Jackson-Shaw Company/ Mr. Christopher Gardner City of Coppell/Ms. Beverly Hurtsman Good Fulton Farrell/Mr. Rick Myers McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. original Signed By Keith Atkins Manager, C.M.T. KEA/Inc 2424SYUTZ DR. · SUITE400 ,, DALLAS, TX75235 · ~L [2141350 5600 " F^X [214] 3500019