Loading...
Vista Point II-LR050112GEOTECHNICALAND G R r~l I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 44 REG PROJECT NO. 11685 SAMPLE DATE: 01-12-05 TECHNICIAN: F. Thornton, Jr. CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Piers Quantity Represented 10/10 Mix Identification Desitin Information Source of Concrete I Southern Star 9337 Test Results Specified Strength p.s.i. 3000 Set Cylinder Age @ Total Load Compressive No. ID Date Tested Test lbs. Stren~lth p.s.i. 1 5936 01-19-05 7 Damaged in Field Damaged in Field 5936 01-19-05 7 Damaged in Field Damaged in Field 5936 02-09-05 28 Damaged in Field Damaged in Field 5936 02-09-05 28 Damaged in Field Damaged in Field Average Strength p.s.i. Cylinder Data Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number I 5936 6.0 10:30 72 75 NA 763579 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KEA/Inc 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ',' TEL [214] 350 5600 · F^X [214] 3500019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 45 REG PROJECT NO. 11685 SAMPLE DATE: 01-12-05 TECHNICIAN: F. Thornton, Jr. Quantity Represented CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Pier: D-4 10/40 Desitin Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Southern Star 9337 3000 Test Results Set Cylinder Age @ Total Load No. ID Date Tested Test lbs. 1 5937 01-19-05 7 97890 5937 01-19-05 7 95120 5937 02-09-05 28 129630 5937 02-09-05 28 126410 5937 Hold H Compressive Average Strength p.s.i. Stren~lth p.s.~. 3460 3370 3420 4590 4470 4530 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number 1 5937 5.25 2:30PM 72 68 NA 751464 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KEA/Inc 2424 STUTZ DR. ,. SUITE 400 .. DALLAS, TX 75235 .. TEL [214] 350 5600" FAX [214] 350 0019