Vista Point II-LR050110GEOTECHNICAL AND G R G I I ~
ENVIRONMENTAL CONSULTANTE
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 41
REG PROJECT NO. 11685
SAMPLE DATE: 01-10-05
TECHNICIAN: F. Thornton, Jr.
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number J Location
I
Pier: E-3, Bldg. 1
J Quantity Represented
10/10
Desitin Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
Southern Star 9337 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Stren~lth p.s.i. Strength p.s.i.
1 5858 01-17-05 7 103460 3660
5858 01-17-05 7 99960 3540 3600
5858 02-07-05 28 134950 4780
5858 02-07-05 28 135270 4790 4790
5858 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. D Slump Sample Air Temp. Temp. Entrainment Number
1 5858 4.75 12:10Pm 75 68 NA 751380
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.MT.
KEA/Inc
24245TUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 3505600 · F^X [214] 3500019