Loading...
Vista Point II-LR041201GEOTECHNICAL AND ~ F=I r~l I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane, Corporation REPORT NO. 18 REPORT DATE: 12-01-04 REG PROJECT NO. 11685 TECHNICIAN: G. Tseugarakis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (fi) (fi) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Rigs (ea) (fi) Length of Probes Probe Spacing (ft) 2 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No. 11-04-04 Building 3 10,400 125 1 11-05-04 Building 3 16,000 125 1 11-08-04 Building 3 15,600 125 2 11-09-04 Building 3 15,600 125 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/cn 2424STUTZ DR. · SUITE400 · DALLAS, TX 75235 · TEL [2}41350 5600 · F^X [2141350 0019 POST INJECTION CONFIRMATION RESULTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 20 REPORT DATE: 12-01-04 REG PROJECT NO. 11685 PAGE: 1 of 1 CONTRACTOR: Cadence McShane Corporation AREA REPRESENTED: Building 3 Boring Number/Pocket Pen Date Depth W-8 Sampled (feet) W-7 W-9 0.0 - 1.5 2.5 2.5 1.5 1.5 - 3.0 2.5 2.2 2.2 3.0 - 4.5 2.7 2.7 4.5+ 4.5 - 6.0 2.5 3.0 4.5+ 6.0 - 7.5 3.0 3.5 4.5+ 7.5 - 9.0 3.0 3.5 4.5+ 9.0- 10.0 3.5 4.0 4.5+ 11-12-04 Comments: Borings obtained after two injection passes. Based on the test results, an additional pass was considered necessary. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/mg 2424S[UTZ DR. · SUITE 400 ,* DALLAS, TX 75235 ,* TEL [214] 3505600" F^X [2141 3500019 REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 12'1 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane, Corporation REPORT NO. 19 REPORT DATE: 12-01-04 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Injection Specification Depth Injection Spacing Injection Pressure Injection Intervals ~ft0) (5fi,) (psi) (in) 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (fi) (ft) 2 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) 1-10-04 Building 3 10,400 125 Pass No. 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/mg 2424STUTZ DR. · SUITE400 · DALLAS, TX 75235 · TEL[214]3505600 o F^X [214] 3500019