Vista Point II-LR041123 GEOTECHNICAL aND I~i R r'-'l I I p
£NVIRON~IENTAL CONSULTANTS
POST INJECTION CONFIRMATION RESULTS
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 16
REPORT DATE: 11-23-04
REG PROJECT NO. 11685
PAGE: 1 of 1
CONTRACTOR: Cadence McShane, Corporation
AREA REPRESENTED: Building 2
Boring Number/Pocket Pen
Date DepthW-2
Sampled (feet) W-1
11-03-04
W-3
0.0- 1.5 3.50 2.00 2.50
1.5 - 3.0 1.50 1.25 2.50
3.0 - 4.5 4.5+ 2.00 1.25
4.5 - 6.0 3.50 1.75 2.75
6.0 - 7.5 2.75 2.00 3.25
7.5 - 9.0 2.00 2.50 3.00
9.0- 10.0 2.50 2.25 2.75
Comments: Borings obtained after two injection passes. Based on the test results, an
additional pass was not considered necessary.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR. · SUITE 400 - DALLAS, TX 75235 ,, TEL [214] 3505600 · F^X [214] 3500019
POST INJECTION CONFIRMATION RESULTS
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 15
REPORT DATE: 11-23-04
REG PROJECT NO. 11685
PAGE: 1 of 1
CONTRACTOR: Cadence McShane, Corporation
AREA REPRESENTED: Building 1
Boring NumbedPocket Pen
Date DepthW-2
Sampled (feet) W-1 W-3
0.0-1.5 2.0 1.5 1.0
1.5-3.0 1.2 2.2 1.5
3.0-4.5 2.5 2.5 2.2
4.5-6.0 2.5 2.2 2.5
6.0-7.5 2.7 2.0 2.7
7.5-9.0 2.5 3.0 2.5
9.0-10.0 2.7 3.5 2.2
11-01-04
Comments: Borings obtained after two injection passes. Based on the test results, an
additional pass was not considered necessary.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hudsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR, · SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 3505600 '" F^X [214] 3500019
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane, Corporation
REPORT NO. 14
REPORT DATE: 11-23-04
REG PROJECT NO. 11685
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (ft) (psi) (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Ri~ls (ea) (ft) (ft)
2 4 11.5 5
Date I Area Injected (sq ft)
11-01-04 Bldg 2 11,100
11-02-04 Bldg 3 15,600
Average Pressure (psi) I Pass No.
125 2
125 1
Surfactant added at regular intervals: Yes
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hudsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR... SUITE 400 · DALLAS, TX 75235 .. TEL [214] 350 5600" F^X [214] 350 0019
GEOTEChNICALAND G ~ O I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase I
Highway 12'1 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfod Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane, Corporation
REPORT NO. 13
REPORT DATE: 11-23-04
REG PROJECT NO. 11685
TECHNICIAN: G. Tsougarkis
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (fi) (psi) (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Rigs (ea) (ft) (ft)
2 4 11.5 5
Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No.
10-27-04 Bldg 2 14,400 125
10-28-04 BIdg 2 10,200 125 1
10-29-04 Bldg 2 14,400 125 2
10-30-04 Bldg 2 9,600 125 2
Surfactant added at regular intervals: Yes
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 3505600 · ~AX [214] 350 0019
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane, Corporation
REPORT NO. 10
REPORT DATE: 11-23-04
REG PROJECT NO. 11685
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth Injection Spacing Injection Pressure Injection Intervals
(ft) (ft) (psi) (in)
10 5 100-200 12-18
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Rigs (ea) (ft) (ft)
2 4 11.5 5
Date I Area Iniected (sq ft) I Average Pressure (psi) I Pass No.
0-20-04 Bldg 1 9,600 150 1
0-21-04 BIdg 1 19,200 150 1
0-22-04 Bldg 1 12,400 150 1
Surfactant added at regular intervals: Yes
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424 STUTZ DR. ,~ SUITE 400 · DALLAS, TX 75235 ,* T~L [214] 350 5600 ~' FAX [214] 3500019