Loading...
Vista Point II-LR041123 GEOTECHNICAL aND I~i R r'-'l I I p £NVIRON~IENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 16 REPORT DATE: 11-23-04 REG PROJECT NO. 11685 PAGE: 1 of 1 CONTRACTOR: Cadence McShane, Corporation AREA REPRESENTED: Building 2 Boring Number/Pocket Pen Date DepthW-2 Sampled (feet) W-1 11-03-04 W-3 0.0- 1.5 3.50 2.00 2.50 1.5 - 3.0 1.50 1.25 2.50 3.0 - 4.5 4.5+ 2.00 1.25 4.5 - 6.0 3.50 1.75 2.75 6.0 - 7.5 2.75 2.00 3.25 7.5 - 9.0 2.00 2.50 3.00 9.0- 10.0 2.50 2.25 2.75 Comments: Borings obtained after two injection passes. Based on the test results, an additional pass was not considered necessary. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR. · SUITE 400 - DALLAS, TX 75235 ,, TEL [214] 3505600 · F^X [214] 3500019 POST INJECTION CONFIRMATION RESULTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 15 REPORT DATE: 11-23-04 REG PROJECT NO. 11685 PAGE: 1 of 1 CONTRACTOR: Cadence McShane, Corporation AREA REPRESENTED: Building 1 Boring NumbedPocket Pen Date DepthW-2 Sampled (feet) W-1 W-3 0.0-1.5 2.0 1.5 1.0 1.5-3.0 1.2 2.2 1.5 3.0-4.5 2.5 2.5 2.2 4.5-6.0 2.5 2.2 2.5 6.0-7.5 2.7 2.0 2.7 7.5-9.0 2.5 3.0 2.5 9.0-10.0 2.7 3.5 2.2 11-01-04 Comments: Borings obtained after two injection passes. Based on the test results, an additional pass was not considered necessary. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hudsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR, · SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 3505600 '" F^X [214] 3500019 REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane, Corporation REPORT NO. 14 REPORT DATE: 11-23-04 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Ri~ls (ea) (ft) (ft) 2 4 11.5 5 Date I Area Injected (sq ft) 11-01-04 Bldg 2 11,100 11-02-04 Bldg 3 15,600 Average Pressure (psi) I Pass No. 125 2 125 1 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hudsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR... SUITE 400 · DALLAS, TX 75235 .. TEL [214] 350 5600" F^X [214] 350 0019 GEOTEChNICALAND G ~ O I I p ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 12'1 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane, Corporation REPORT NO. 13 REPORT DATE: 11-23-04 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarkis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (fi) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 2 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No. 10-27-04 Bldg 2 14,400 125 10-28-04 BIdg 2 10,200 125 1 10-29-04 Bldg 2 14,400 125 2 10-30-04 Bldg 2 9,600 125 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 3505600 · ~AX [214] 350 0019 REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue CONTRACTOR: Cadence McShane, Corporation REPORT NO. 10 REPORT DATE: 11-23-04 REG PROJECT NO. 11685 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft) (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 2 4 11.5 5 Date I Area Iniected (sq ft) I Average Pressure (psi) I Pass No. 0-20-04 Bldg 1 9,600 150 1 0-21-04 BIdg 1 19,200 150 1 0-22-04 Bldg 1 12,400 150 1 Surfactant added at regular intervals: Yes Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424 STUTZ DR. ,~ SUITE 400 · DALLAS, TX 75235 ,* T~L [214] 350 5600 ~' FAX [214] 3500019