Vista Point II-LR050408GEOTECHNICAL AND ~ F:~ r~l I I ~
ENVI P, ON P1 ENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway '121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 112
REG PROJECT NO. 11685
SAMPLE DATE: 04-08-05
TECHNICIAN: C. Johnson
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location
Paving: 60'S, 170'W of SE corner of Bldg. 1
Paving: 70'S, 110'W of SE corner of Bldg. 1
Design Information
Quantity Represented
70/200
120/200
Specified Strength p.s.i.
3500
Source of Concrete
Southern Star
Mix Identification
9335
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Stren~lth p.s.i. Strength p.s.i.
1 8827 04-15-05 7 82960 2940
8827 05-06-05 28 114670 4060
8827 05-06-05 28 114600 4060 4060
8827 Hold H
2 8828 04-15-05 7 93510 3310
8828 05-06-05 28 123050 4360
8828 05-06-05 28 121840 4310
8828 Hold H
434O
Cylinder Data
Set Cylinder
No. i ID
1 8827
2 8828
Time of Concrete Air Ticket
Slump Sample Air Temp. Temp. Entrainment Number
6.5 10:10AM 64 70 4.4 777086
5.0 10:45AM 68 76 4.6 777091
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
(1) AECC, Inc./Mr. Chad Stephens
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214] 3505600 · F^X [214] 3500019
GEOTECHNICALAND [~ R r'l I I ~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 113
REG PROJECT NO. 11685
SAMPLE DATE: 04-08-05
TECHNICIAN: D. Balderas
Location of Sample
Set Number J Location J Quantity Represented
1 Paving: 32'N, 70'W of SE corner of Bldg. 1 230/450
2 Paving: 60'S, 20'W of SE corner of Bldg. 2 250/450
3 Paving: 105'S, 15'E of NE coner of Bldg. 3 450/450
Design Information
Source of Concrete J Mix Identification J Specified Stren~lth p.s.i.
Southern Star 9339 3500
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Stren~lth p.s.i. Strength p.s.i.
1 8832 04-15-05 7 103490 3660
8832 05-06-05 28 124050 4390
8832 05-06-05 28 126160 4470 4430
8832 Hold H
2 8833 04-15-05 7 94830 3360
8833 05-06-05 28 123400 4370
8833 05-06-05 28 117060 4140 4260
8833 Hold H
3 8834 04-15-05 7 87900 3110
8834 05-06-05 28 127110 4500
8834 05-06-05 28 125420 4440 4470
8834 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. J ID Slump Sample Air Temp. Temp. Entrainment Number
i 8832 5.0 12:17PM 97 78 2.5 777104
8833 6.5 1:26PM 90 79 4.2 777104
8834 4.5 2:40PM 90 80 3.9 777125
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 3500019