Vista Point II-LR050113GEOTECHNICAL AND J~ R r--I U ~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 46
REG PROJECT NO. 11685
SAMPLE DATE: 01-13-05
TECHNICIAN: F. Thornton, Jr.
CONTRACTOR: Cadence McShane Corporation
Loc~tion of Sample
Set Number [ Location
1 Pier: C.5-1, Bldg. 1
J Quantity Represented
50/50
Desitin Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Southern Star 9337 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Stren~lth p.s.i.
1 5940 01-20-05 7 89200 3160
5940 01-20-05 7 92370 3270 3220
5940 02-10-05 28 134940 4780
5940 02-10-05 28 132120 4680 4730
5940 Hold H
Cylinder Data
Set Cylinder Time of I Concrete I Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 5940 6.0 3:45PM 52 58 NA 763614
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppelt/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
(1) McHale Engineering/
Mr. Gary McHale
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
Manager, C.M.T.
KEA/Inc
2424STUTZ DR. · SUITE400 ', DALLAS, TX75235 · TEL[214] 3505600 o FAX [21413500019