Loading...
Vista Point II-LR050113GEOTECHNICAL AND J~ R r--I U ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 46 REG PROJECT NO. 11685 SAMPLE DATE: 01-13-05 TECHNICIAN: F. Thornton, Jr. CONTRACTOR: Cadence McShane Corporation Loc~tion of Sample Set Number [ Location 1 Pier: C.5-1, Bldg. 1 J Quantity Represented 50/50 Desitin Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Southern Star 9337 3000 Test Results Set Cylinder Age @ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Stren~lth p.s.i. 1 5940 01-20-05 7 89200 3160 5940 01-20-05 7 92370 3270 3220 5940 02-10-05 28 134940 4780 5940 02-10-05 28 132120 4680 4730 5940 Hold H Cylinder Data Set Cylinder Time of I Concrete I Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number 1 5940 6.0 3:45PM 52 58 NA 763614 Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppelt/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers (1) McHale Engineering/ Mr. Gary McHale Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KEA/Inc 2424STUTZ DR. · SUITE400 ', DALLAS, TX75235 · TEL[214] 3505600 o FAX [21413500019