Loading...
Vista Point II-LR041229GEOTECHNICAL AND E~ R IF-'I I I p ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Vista Point II, Phase I Highway 121 and MacArthur Boulevard Coppell, Texas REPORTED TO: Cadence McShane, Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Brandon Perdue REPORT NO. 24 REPORT DATE: 12-29-04 REG PROJECT NO. 11685 PAGE: 1 of 1 CONTRACTOR: Cadence McShane, Corporation AREA REPRESENTED: Building 3 Boring Number/Pocket Pen Date Depth I J W-11 Sampled (feet) W- 10 11-22-04 W-12 0.0-1.5 0.7 1.5 2.5 1.5-3.0 1.0 2.2 3.0 3.0-4.5 2.7 2.5 2.0 4.5-6.0 2.2 4.5+ 2.0 6.0-7.5 3.0 4.5+ 2.7 7.5-9.0 4.2 4.5+ 3.2 9.0-10.0 4.5+ 2.0 3.2 FREE SWELL TEST RESULTS: Borinq Depth % Swell Final Penetrometer Readinq W-11 6.0 - 7.5 3.89 4.5 Comments: Borings obtained after three injection passes. Based on the test results, an additional pass was considered necessary. Mail Distribution: (1) Cadence McShane, Corporation/ Mr. Brandon Perdue (1) Jackson-Shaw Company/ Mr. Christopher Gardner (1) City of Coppell/Ms. Beverly Hurtsman (1) Good Fulton Farrell/Mr. Rick Myers Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424STUTZ DR. · SUITE400 · DALLAS, TX 75235 ,. TEL [2141350 5600 ,' ~^X [2141350 0019