Vista Point II-LR041229GEOTECHNICAL AND E~ R IF-'I I I p
ENVIRONMENTAL CONSULTANTS
POST INJECTION CONFIRMATION RESULTS
Vista Point II, Phase I
Highway 121 and MacArthur Boulevard
Coppell, Texas
REPORTED TO: Cadence McShane, Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Brandon Perdue
REPORT NO. 24
REPORT DATE: 12-29-04
REG PROJECT NO. 11685
PAGE: 1 of 1
CONTRACTOR: Cadence McShane, Corporation
AREA REPRESENTED: Building 3
Boring Number/Pocket Pen
Date
Depth
I
J W-11
Sampled (feet) W- 10
11-22-04
W-12
0.0-1.5 0.7 1.5 2.5
1.5-3.0 1.0 2.2 3.0
3.0-4.5 2.7 2.5 2.0
4.5-6.0 2.2 4.5+ 2.0
6.0-7.5 3.0 4.5+ 2.7
7.5-9.0 4.2 4.5+ 3.2
9.0-10.0 4.5+ 2.0 3.2
FREE SWELL TEST RESULTS:
Borinq Depth % Swell Final Penetrometer Readinq
W-11 6.0 - 7.5 3.89 4.5
Comments: Borings obtained after three injection passes. Based on the test results, an
additional pass was considered necessary.
Mail
Distribution: (1) Cadence McShane, Corporation/
Mr. Brandon Perdue
(1) Jackson-Shaw Company/
Mr. Christopher Gardner
(1) City of Coppell/Ms. Beverly Hurtsman
(1) Good Fulton Farrell/Mr. Rick Myers
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith E. Atkins
Manager, CMT
BW/cn
2424STUTZ DR. · SUITE400 · DALLAS, TX 75235 ,. TEL [2141350 5600 ,' ~^X [2141350 0019