Loading...
WA0101-LR050719Construction Materials Testing and Environmental Consulting Texas CMT, Irlc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION acDorI I)alc July 19, 2005 Date Concrete Placed: July 8, 2005 ( 'licnt City of Coppell Project: Hwy. 121 Water Line Contraclor FOX Contractors Concrete Supplier and Plan;: Southern Star 29 I ocalion of Placement: Paving Standard 6"x 12" Area 28.27 Square Incges Concrete Report No: 1 Project No: 205-0137 MATERIALS So~, sss B~ w,, OBSERVATION DATA Descrilmon (Lbs~CuYd) Mix Number: 9355 Time Sample Batched: £ cmcnl: Time Sampled: ?h Ash Sample Location: ' Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 90°I: 1 me Aggregate: Concrete Range: 99°F * Admixtures: Slump Range (inches): 4VJ Weather Conditions: Partly Cloudy I Time Started: 12:30 pm 2 Time Completed: 03:30 pm Added Water 40 gallons * Sample Air Content (%): 4% Total Cubic Yards Placed: 10 N/A 02:2l pm Junction of Waverly & Hw3, 121- soulh end 859/974147 Requin d Stren[~th (Lbs/sq.in 4,000 HWY I 7 07/15/05 93,100 3,290 HWY 2 28 08/05/05 4~A- H WY3 28 08/05/05 HWY 4 H HOLD Remarks and/or Distribution: * Foreman informed of v. ater & temperature cc Ms Suz~an C 'Iaylot - City of Coppell Mr Douglas K Sho~ers - BirkhotT, Hendricks & Conway, LLP Reviewed by: ~