Loading...
WA0301-LR050720 (2)Construction Materials Testing and Environmental Consulting Texas CM% [nc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: July 20, 2005 Project No: 205-01 Client: Moisture Report No. City of Coppell sample Date: July 12, 2005 Project: L~och Lane 3 Identification: Test Procedure: Moisture Density Relationship ASTM D698 Test Results: Method .................................................. A Optimum Moisture Content .................................. 17.2 percent Maximum Density ......................................... 103.0 pounds per cubic foot Rammer Type ............................................. Automatic Material Description ....................................... Dark Brown Silty Clay Material Origin ........................................... 620 Loch Lane Moisture Preparation Procedure .............................. Air Dry Liquid Limit ............................................. 43 Plastic Limit ............................................. 16 Plasticity Index ........................................... 27 Percent Passing No. 200 U.S. Sieve ........................... 65 Technician: AT cc Ms Suxan C Taylor- City of Coppell Mr Larry Davis - City of Coppell Mr Luis Velasquez- Fox Contractors. Our letters and reports are lbr the exclusive use of the client lo whom they are addressed. The use of our name must receive our prior written approval Our let e s and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products Construction Materials Testing and Environmental Consulting Texas CMT, Irlc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: July 20, 2005 City of Coppell July 12, 2005 Loch Lane Moisture Density Relationship ASTM D698 Project No: 205-015/ Moisture Report No. 2 Test Results: Method .................................................. A Optimum Moisture Content .................................. 17.2 percent Maximum Density ......................................... 104.2 pounds per cubic foot Rammer Type ............................................. Automatic Material Description ....................................... Brown Silty Clay w/occasional ......................................................... calcareous nodules Material Origin ........................................... 604 Loch Lane Moisture Preparation Procedure .............................. Air Dry Liquid Limit ............................................. 45 Plastic Limit ............................................. 15 Plasticity Index ........................................... 30 Percent Passing No. 200 U.S. Sieve ........................... 63 Technician: AT cc Ms Suzan C Taylor- City of Coppell Mr Larry Davis - City of Coppell Mr LulS Velasquez - Fox Contractors, [nc Our letters and reVarls are for the exclusive use of the client 1o whom they are addressed. The use of our name must receive our prior wrmen approval Our letters and reports apply' onl'~ to thc sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products Construction Materials Testing and Environmental Consulting Tex&s CMT, IBC. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: July 20, 2005 City of Coppell July 12, 2005 Loch Lane Moisture Density Relationship ASTM D698 Project No: 205-0157 Moisture Report No. 3 Test Results: Method .................................................. A Optimum Moisture Content .................................. 14.5 percent Maximum Density ......................................... 109.8 pounds per cubic foot Rammer Type ............................................. Automatic Material Description ....................................... Brown Sandy Clay Material Origin ........................................... 612 Loch Lane Moisture Preparation Procedure .............................. Air Dry Liquid Limit ............................................. 34 Plastic Limit ............................................. 14 Plasticity Index ........................................... 2_0~ Percent Passing No. 200 U.S. Sieve ................... Technician: AT ( ~~. cc MS Suzan C Taylor- City of Coppell Mr Larry Daws - City of Coppell Mr I.ms Velasquez - Fox Contractors. Inc n ~ o he sarnp e es ed and/or observed and are nol necessarily indicative of the quant/ties of apparently identical or similar products