Loading...
MA0405-LR050719: one Engineering Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235932 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 07/19/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STR~NGI~I: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: 1 SPECIFICATION REQUIREMENTS 3600 psi @ 28 Days 4" maximum NA ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED M1X DESIGN I.D,: 732 SLUMP PLACEMENT DATE: 06/15/2005 (inches) WF~.THER CONDITIONS: Clear 4.5 TIME SAMPLED: 9:10atTl BATCH TIME: NA TEMPERATURE (F) - AIR 87 F CONCRETE: 88 F TaUC~< NO: 217 TICKE~r NO: 148653 AIR CONTENT (%): NA UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MacArthur and Samuel; northwest and southwest comers of MacArthur and North Village; and northwest comer of MaeArthur and parkway SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Northwest and southwest comer of MacArthur and Samuel, 2nd lift CYLINDER MARKED DATE AGE DIAMETER SET NO. TESTED (days) (inches) 1 1 06/20/2005 5 6.00 28.26 1 2 06/22/2005 7 6.00 28.26 I 3 07/13/2005 28 6.00 28.26 1 4 07/13/2005 28 6.00 28.26 Water added at site: 10 gallons Technician: Francisco Calvillo, CET Report Distribution: (1) City of Coppall ( t ) City of Coppell MAXIMUM COMPRESSIVE AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 101730 3600 Unbonded Cap 105970 3750 Unbonded Cap Started: 8:30am 132330 12841O Average Finished: 10:30am 4680 Unbonded Cap 4540 Unbonded Cap 4610 Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation m quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in flail without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of I : .one Engineering Client: City of Coppell Ms. Suzan Taylor, Engineerkng Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth~ TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 235940 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 07/19/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Pavement Services p L.adNT: Mobile Crete SPECIFICATION REQUIREMENTS 3600 psi @ 28 Days 4" maximum NA ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 2 SLUMP PLACEMENT DATE: 06/15/2005 (inches) WEATHER CONDITIONS: C]eal' 4.0 TIME SAMPLED: 9:5011111 BATCHTIME: 7:40am TEMPERATURE (F)- AIR 89 v CONCRETE: 90 F TRUCKNO: 2621 TICKETNO: 1827 Am CONTEYr (%): NA UNIT WEIGHT (pet): NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MacArthur and Samuel; nordawest and southwest comers of MacArihur and North Village; northwest comer of MacArthur and Park~vay SAMPLE LOCATION: REPORT OF TESTS Northwest and southwest comer of MacArthur and Samuel, first lift Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) 1 1 06/20/2005 5 6.00 28.26 115820 4100 1 2 06/22/2005 7 6.00 28.26 121170 4290 1 3 07/13/2005 28 6.00 28.26 154950 5480 I 4 07/13/2005 28 6.00 28.26 150400 5320 Average 5400 See Report #235932 for technician time. Technician: Francisco Calvillo, CET Report Distribution: (1) City of Cappell (1) City of Coppell Started: Finished: FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap Ron Project Manager LIMITATIONS: The test resulB presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fuIl without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 ofl {one Engineer,ng Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 236135 Project No.: 0510346 Date of Service: 06/17/2005 Report Date: 07/19/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: 732 SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 732 PLACEMENT DATE: 06/17/2005 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9:45am BATCH Th'Cra: NA TEMPERATURE (F) - AIR 83 F CONCRETE: 88 F TRUCKNO: 230 TICK~TNO: 148799 AIR CONTENT (%): 3.5 UNITWEIGHT(pc0: NA OVERALL PLACEMENT LOCATION: MacArthur Road, south side of Bethel School Road MEASURED SLUMP (inches) 1.0 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 06/24/2005 7 6.00 28.26 1 2 06/24/2005 7 6.00 28.26 1 3 07/15/2005 28 6.00 28.26 1 4 07/15/2005 28 6.00 28.26 Technician: Bobby Robinson Report Distribution: (I) City of Coppell (1) City of Coppell Started: 8:30am 106720 3770 Unbonded Cap 106500 3770 Unbonded Cap Average 3770 Finished: 10:45am 145570 5150 Unbonded Cap 147750 5230 Unbonded Cap Ave rage 5190 Ro ~e~~lng Clay Stark Project Manager LLMITAT1ONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject mater provided by persons or conditions over which we have no conlrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fulI without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of I Engineering 89¢/8 Ambassador Ro~, Dallas. TX 75247 2696 Gravel Drive, Fort V~ orth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214)630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Ci~' of CoppeI1 Ms. Suzan Taylor, Engineering DeN PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 Report No.: 235940 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 07/19/2005 Obtain samples of fresh concrete at the p acement locations, perform required field testing, cast compressive strengtl~ samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECTDATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTILkCTOR: Pavement Services CONCRETE S[~'PLIER: Pavement Services P L.~NT: Mobile Crete SPECIFICATION REQUIREMENTS 3600 psi @ 28 Days 4" maximum NA ASTM C-i 72 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 except 9 ] 2 REPORT MEASURED MIX DESIGN I.D.: 2 SLUMP PLACEMENT DATE: 06/15/2005 (inches) WEATHER CONDITIONS: Clear 4.0 TIME SAMPLED: 9:50mll BATCH T1ME: 7:40am IEMPERATURE (F)- AIR 89 F CONCRETE: 90 F TRUCK NO: 262 ] TICKET NO: 1827 AIR CONTENT (%): NA UN1TWEIGHT(pcl): NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MacArthur and Samuel; northwest and southwest comers of MacArthur and North Village; northwest comer of MacAtthur and Parkm, ay SAMPLE LOCATION: OF TESTS Northwest and southwest comer of MacArlhur and Samuel, first Iifx Concrete Compressive Cylinder 6" x 12" C~qLINDER IVLS~R. KED DATE AGE DIAMETER AREA SET NO. TESTED (days) (inches) (sq.in.) 1 1 06/20/2005 5 6.00 28.26 1 2 06/22/2005 7 6.00 28.26 1 3 07/13/2005 28 6.00 28.26 i 4 07/13/2005 28 6.00 28.26 See Report {235932 for technician Lime. Technician: Francisco Calvillo, CET Report Distribution: (I) City of Coppell (1) CiD' of Coppell Started: Finished: IVIAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 115820 4100 Unbonded Cap 121170 4290 Unbonded Cap 154950 5480 Unbonded Cap 150400 5320 Unbonded Cap Average 5400 Ron Project Manager LEVIITATIONS: The test results presented herein were prepared ba3ed upon the specific samples provided for testing We assume no responsibility for variation in quality. (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineenng Services, Ltd. 0!SS Page 1 ofl Engineering 8908 Ambassador Row. Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 63{)0 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 CoppeI1 TX 75019 Project: Brick Paver Replacement MA 04-05 Report No.: 235932 Project No.: 0510346 Date of Service: 06/15/2005 Report Date: 07/19/2005 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRA. CTOR: Pavement Sen, ices CONCRETE SUPPLIER: Redi-Mix PLANT: ] SPECIFICATION REQUIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MkX DESIGN I.D.: 732 SLUMP PLACEMENT DATE: 06/15/2005 (inches) WEATHER CONDITIONS: Clear 4.5 TIME SAMPLED: 9:10am BATCHTIME: NA TEMPERATURE (F) - AIR 87 F CONCRETE: 88 F TRUCK NO: 217 TICKET NO: 148653 AIR CONTENT (%): NA UNIT WEIGHT (pcl): NA OVERALL PLACEMENT LOCATION: Northwest and southwest comers of MacAnhur and Samuel; northwest and southwest comers of MacArthur and Noah Village; and northwest comer of MacArthnr and parkwvay SAMPLE LOCATION: REPORT OF TESTS Northwest and southwest comer of MacArthur and Samuel, 2nd lift Concrete Compressive Cylinder 6" x 12" MARKED DATE AGE DIAMETER SET NO. TESTED (days) (inches) MAXIMUM COMPRESSIVE AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 1 1 06/20/2005 5 6.00 1 2 06/22/2005 7 6.00 1 3 07/13/2005 28 6.00 1 4 07/13/2005 28 6.00 Water added au sine: 10 gallons Technician: Francisco Calvillo, CET Report Distribution: ( 1 ) Ci~ of Coppell ( I ) Ci~ of Coppell 28.26 101730 28.26 105970 28.26 132330 28.26 128410 Average Started: 8:30am Finished: I0:30am 3600 Unbonded Cap 3750 Unbonded Cap 4680 Unbonded Cap 4540 Unbonded Cap 4610 Clay Stark Project Manager LLMITATIONS: The test results presented 0erein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition. appearance, etc ) or any other feature of similar subjec matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and sha0 not be reproduced excep! in full without the written approval of RoDe Engineering Services, Ltd (;iSS Page I ofl ? one Engineering 8908 Ambassador Row. Dallas. TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CIient: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Project: Brick Paver Replacement MA 04-05 Report No.: 236135 Project No.: 0510346 Date of Service: 06/17/2005 Report Date: 07/19/2005 Selwices: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicabIe standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: 732 SPECIFICATION REQTIREMENTS 3600 psi ~ 28 Days 4" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM 0231 ASTM C- 1064 ASTM C- 1231 ASTM C-39 except 9 1 2 MIX DESIGN I.D.: 732 PLACEMENT DATE: 06/17/2005 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9:45mn BATCH TIME: NA TEMPERATURE (F)- AIR 83 F CONCRETE: 88 F TRUCK NO: 230 TICKET NO: 148799 AIR CONTENT (%): 3.5 UNIT WEIGHT (pelt: NA OVER.ALL PLACEMENT LOCATION: MacArthur Road, south side of Bethel School Road SAMPLE LOCATION: Same as above REPORT OF TESTS MEASURED SLUMP (inches) 1.0 Concrete Compressive Cylinder 6" x 12" CYLINDER .MARKED DATE AGE DIAMETER AREA SET NO. TESTED (days) (inches) (sq.in.) I I 06/24/2005 7 6.00 28.26 1 2 06/24/2005 7 6.00 28.26 1 3 07/15/2005 28 6.00 28.26 1 4 07/15/2005 28 6.00 28.26 Technician: Bobby Robinson Report Distribution: (1) City of Coppell (I) Cit5 of Coppell Started: 8:30am MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 106720 3770 Unbonded Cap 106500 3770 Unbonded Cap Average 3770 Finished: 10:45am 145570 5150 Unbonded Cap 147750 5230 Unbonded Cap Average 5190 Roweling Clay Stark Prqject Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similar subject ma~er provided by persons or conditions over which we have no control Our lelters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 01SS Page Iofl