Loading...
MA0405-LR050713 one Engineenng 8908 Ambassador Row, Dallas. TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rotbway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Report No.: 235853 Project No.: 0510346 Date of Service: 06/14/2005 Report Date: 07/13/2005 Project: Brick Paver Replacement MA 04-05 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECTDATA MEASURED CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Pavement Services pL.a2NT: NA SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days SLUM~ (in): 3" - 5" AIR (%): NA TEST METHOD: ASTM C-172 ASTM C-31 ~., ASTM C-143 ASTIVl C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: NA PLACEMENT DATE: 06/14/2005 WEATHER CONDITIONS: S'dllIly TIME SAMPLED: 12:40pm BATCHTIME: 12:36pm TEMPERATURE (F) - AIR 94 F CONCRETE: 97 F TRUCKNO: 2022 TICK]ETNO: 1826 AIR CONTENT (%): 1.8 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Paving replacement at north and south turn lane of parkway Road and MacArthur intersection SAMPLE LOCATION: REPORT OF TESTS .... x 12" Concrete Cornpress]ve Cyhnder 6 SLUMI' (inches) 4.75 CYLINDER MARKED DATE AGE SET NO. TESTED (days) 1 1 06/21/2005 7 1 2 07/12/2005 28 1 3 07/12/2005 28 1 4 Hold Technician: Osvaldo Flores Report Distribution: (1) City of Coppall (1) City of Coppall D IA]~,{ETER AREA (inches) (sq.in.) 6.00 28.26 6.00 28.26 6.00 28.26 Started: 10:45am Finished: l:]5pm MAXIMIfM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 81270 2870 Unbonded Cap 112940 3990 113250 4000 Average 4000 Stark Project Manager Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of 1 {one Engineenng 8908 Ambassador Row~ Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Stp. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Suzan Taylor, Engineering Dept PO Box 9478 Coppell TX 75019 Report No.: 237216 Project No.: 0510346 Date of Service: 07/05/2005 Report Date: 07/13/2005 Project: Brick Paver Replacement MA 04-05 Services: Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED CONTRACTOR: Pavement Services CONCRETE SUPPLIER: Redi-Mix PLANT: 1 SPECIFICATION REQUIllEMENTS STRENGTH: 3600 psi ~ 28 Days SLUM~ (in): 4" maximum Am (°/o): 4% - 6% TEST METHOD: ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 732 SLUM[P PLACEMENT DATE: 07/05/2005 (inches) WEATHER CONDITIONS: Cloudy 3.0 TIME SAMPLED: 9:15am BATCH TIME: NA TEMPERATURE (F) - AIR 79 F CONCRETE: 82 F TaUCKNO: 213 TICKET NO: 149749 AIR CONTENT (%): 5.3 UNITWEIGHT (pcO: NA OVERALL PLACEMENT LOCATION: MacArthur Boulevard at North Village Parkway, north and south colored concrete paving SAMPLE LOCATION: REPORT OF TESTS North side, 15' west of center median Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE AGE DIAMETER SET NO. TESTED (days) (inches) MAXIMUM COMPRESSIVE AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 1 1 07/12/2005 7 6.00 28.26 1 2 08/02/2005 28 0.00 0.00 1 3 08/02/2005 28 0.00 0.00 1 4 Hold Technician: Dan Rogers Report Distribution: (1) City of Coppell (1) City of CoppelI Started: 7:30am 120880 4270 Unbonded Cap Unbonded Cap Unbonded Cap Finished: 10:15am Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or condihons over which we have no ¢on~-ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 21SS Page 1 of I