MA0405-LR050608?,one Engineenng
8908 Ambassador Row, Dallas, 'IX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston. TX 77040
Corporate Phoue: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
City of Coppell
Ms. Suzan Taylor, Engineering Dept
PO Box 9478
Coppell TX 75019
Project: Brick Paver Replacement
MA 04-05
Report No.: 234986
Project No.: 0510346
Date of Service: 06/02/2005
Report Date: 06/08/2005
Ser~'iees: Perform In-Place Density Test in accordance with ASTM Standards.
PROJECT DATA
CONTraCTOR:
TestMethods:
Pavement Services
Gauge: Troxler 3430 Moisture
ASTM D-2922
ASTM D-3017 Gauge Serial No: 35558 Current: 613
Test Mode: BS Previous: 612
MfD No.
MOISTURE DENSITY RELATIONS
Maximum
Description Moisture % Density per
Recycled Crushed Concrete w/Clayey Sand 12.5 117.0
Standard Coun~
Density
Current: 2464
Previous: 2444
Project Requirements
Moisture Density
-2/+2 95 rain
FIELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/I) MOISTURE WETDENSITY DRY DENSITY DENSITY
No. (%) (pcl) (pcl~ (% max)
Paving subgrade
1 10xl 0 area by southeast comer of 0" 1
MacArthur Boulevard and Bethel School
Road
Paving subgrade
2 10xl0 area by northeast comer of 0" 1
MacArthur Boulevard and Bethel School
Road
Paving subgrade
3 M-shaped area by southeast comer of 0" 1
MacArthur Boulevard and Condor Drive
Paving subgrade
4 J-shaped area by northeast comer of 0" 1
MacArthur Boulevard and Condor Drive
15.7' 130.4 112.7 96
9.9* 120.1 109.3 93 *
15.1' 139.2 120.9 103
10.9 111.9 100.9 86 *
L[M~TAT~NS:Thete~tresu~tspresentedhereinwerepreparedbasedup~nthespeci~csamp~esp~videdf~rtesting We assume no responsJb ty for var at on nqualitv
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leaers and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the ~zitten approvaI of Roue Engineering Services, Ltd
07SS Page 1 of 2
Report No.: 234986
Project No.: 0510346
Client: Ci~ of Coppell
An asterisk (*) appears next to test results which do NOT meet the project~ /
Technician: Frm~cisco Calvillo, CET Started: 8:00am Finished: 10:00a l~ne ga/gm/e~rlng
Report Distribution:
(I) City of CoppelI
(I) CiD' of Coppell Clay Stark
Project Manager
LIMITATIONS; The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
/composition, appearance, etc.) or any other feature of similar subJeCt mattex provided by persons or conditions over which we have no control Our letters and reports are
for the exclusive use of the clients to whom the5' are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd
'7SS Page 2 of 2