Mercantile P2-CS050613COPPELL
MEMORANDUM
TO:
FROM:
DATE:
REF:
Rick O'De[l, Engineenng
Danny Hightower, Public Works
June 13, 2005
Mercantile Addition, Phase II
2.
3.
4.
5.
6.
Paint meter can lids blue
Fire hydrant needs blue street marker in street
Test paper~vork on all DC (domestic and irrigation and vault 2)
Blocking under valves in vault
City sewer lines video or make private lines per Rick O'Dell; all City lines have to be
ideo taped - send to Rick O'Dell and Ted to check work on City lines.
Call 972-462-5150 to have Danny Hightower check punch list after completion.
c, OP,PfiL~
1955.2oOS
[-d dt~E:[O ~0 E:I un[-
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Rick O'Dell Construction Inspector Engineering
Brent Adams, Streets Division Public Works
June 13, 2005
Final Walk-tlLm Mercantile Addition Phase 2
DRAINAGE
1. Drop inlet OK.
PAVING
1. All OK.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT