Loading...
SW0405-LR050505Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Quantum Contracting, Inc. PROJECT: City of Coppell Sidewalk Repairs Coppel[, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Sidewalk in front of 353 and 357 Parkway Drive 05.1030 5 May 2005 Southern Star SAMPLE DATA: SET 1 SET2 MIX NO. 9339 Truck No. $ Cement Ticket No. 1045419 Flyash Time Batched 10:39am Sand Time Sampled 11:2Oam in. Concrete Temp. (ASTM C1064) 67°F 1.0 in. Air Content (ASTM C231) 4.6% Water Unit Weight (ASTM C138) Admix //1 Ambient Temp. Admix //2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren~lth 28-Day IASTM C143) pS1 Strength 5 6.75 7 05/12/05 6 6.75 7 05/12/05 7 6.75 28 06/02/05 8 6.75 28 06/02/05 77,200 2730 76,800 2720 98,4QQ 348Q 10~,0Q& 3540 28-Day Average 3S1Q 3000 TECHNICIAN: DISTRIBUTION: RJW (10:30am-12:30pm) (1) Quantum Contracting, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148